Installation
2
Installation
2.1 Space Requirements
•
Installation plate thickness: 1.5 - 9.0 mm (0.06 - 0.35 inch)
•
Space requirements when installing the operator panel:
50 mm
100 mm
60 mm
304 mm
398 mm
100 mm
(4.0 inch)
100 mm
(4.0 inch)
(4.0 inch)
(2.0 inch)
50 mm
(2.0 inch)
(11.97 inch)
(15.67 inch)
(2.36 inch)
Caution:
The openings on the enclosure are for air convection. Do not cover these openings.
2.2 Installation Process
1. Unpack and check the delivery. If damage is found, notify the supplier.
x 14
Panel cut out 355.5 x 278.5 mm
(14.0 x 10.96 inch)
Note:
Place the operator panel on a stable surface during installation.
Dropping it or letting it fall may cause damage.
Beijer Electronics, MAEN775E
7