Installation
10
Beijer Electronics, MAEN965
3. Secure the operator panel in position, using all the fastening holes and the
provided brackets and screws:
4. Connect the cables in the specified order.
Use an M5 screw and a grounding conductor (as short as possible)
with a cross-section of minimum 2.5 mm
2
.
5. Carefully remove the laminated film, if applicable, over the operator panel
display, to avoid static electricity that could damage the panel.
x 13
0.5 - 1.0 Nm
B
C
D
A
Caution
Ensure that the operator panel and the controller system have the
same electrical grounding (reference voltage level), otherwise errors
in communication may occur.
Caution
- Use only shielded communication cables.
- Separate high voltage cables from signal and supply cables.
Caution
- The operator panel must be brought to ambient temperature
before it is started up. If condensation forms, ensure that the
operator panel is dry before connecting it to the power outlet.
- Ensure that the voltage and polarity of the power source is correct.
24V DC
RS422/RS485
24V DC
1
CF
CARD
B
A
C
D
RS232
Controller
Power
Ethernet
Summary of Contents for EXTER T100sr
Page 1: ...EXTER T100sr Installation Manual MAEN965 2008 11 English...
Page 4: ...Table of Contents Beijer Electronics MAEN965...
Page 8: ...Safety Precautions 8 Beijer Electronics MAEN965...
Page 12: ...Installation 12 Beijer Electronics MAEN965...