Testing – 6
6–39
79 Reconnect
VOLTAGE INPUTS:
Configuration V1
CURRENT INPUTS:
None
TEST SETTINGS:
Time Delay
D
Cycles
(2 to 65,500)
Reconnect Initiate
R
(1 to 8)
Programmed Outputs
Z
Output
(1 to 8)
1.
Confirm settings to be tested.
2.
Connect inputs in Configuration V1 as designated previously. Refer to Section 6.4,
Input Configurations
for configuration.
3.
Adjust the three-phase source to Nominal Voltage.
4.
Setup
: Remove the A phase voltage input to cause Function 27 to trip Output
R
(Output
R
will trip
after Function 27 times out).
5.
Time Test
: With output contacts connected to the timer, reapply the A phase voltage input and start
timing. The operation time will be D cycles within
&
2 cycles.
6.
Press
TARGET/OUTPUT RESET
pushbutton to remove targets.
7.
If testing is complete, enable any functions disabled for this test. If further testing is desired, check
the proper functions to disable for the next test and continue from this point.
Summary of Contents for M-3520
Page 1: ...Instruction Book M 3520 Intertie Protection Relay ...
Page 83: ...2 50 M 3520 Instruction Book This Page Left Intentionally Blank ...
Page 95: ...M 3520 Instruction Book 3 12 This Page Intentionally Left Blank ...
Page 133: ...M 3520 Instruction Book 5 12 This Page Intentionally Left Blank ...
Page 195: ...A 20 M 3520 Instruction Book This Page Intentionally Left Blank ...
Page 213: ...D 12 M 3520 Instruction Book This Page Intentionally Left Blank ...