A13914AF
9-3
Maintenance
Overview
9
•
Monthly
•
Two-Month
•
Three-Month
•
Four-Month
•
Six-Month
This maintenance schedule is developed for all systems. Following specific maintenance
procedures, running calibration and controls may be required.
Twice Weekly Maintenance
•
Clean Sample and Reagent Probes, Mixers, EIC, and Flow Cell
Weekly Maintenance
•
Check Reagent Levels
•
Replace Cuvette Wiper
•
Clean Total Protein and Albumin Cups (DxC 800 only)
•
Clean Probes (Exterior)
•
Clean Flow Cell, Cups and CC Probes/Mixers (Automated) (This weekly maintenance is
superceded by the mandatory Twice Weekly procedure Clean Sample and Reagent Probes,
Mixers, EIC, and Flow Cell.)
•
Check Chloride Calibration Span
Monthly Maintenance
•
Replace Alkaline Buffer
•
Clean All Cup Modules
•
Clean Mixers
•
Calibrate Lamps and Sensor
•
BUNm/UREAm Electrode Maintenance
•
Replace CTS Blade (1-Blade Narrow CTS Option)
Two-Month Maintenance
•
Replace CTS Blade/Wick (1-Blade Thick CTS option)
•
Change/Clean Air Filters
Three-Month Maintenance
•
Replace Syringe Plungers
Summary of Contents for UniCel DxC 600
Page 4: ...A13914AF iv Revision History ...
Page 26: ...A13914AF xxvi Safety Notice Documentation Symbols ...
Page 36: ...A13914AF xxxvi Introduction How to Use this Manual ...
Page 132: ...A13914AF 3 34 System Setup Options Auto Generation of Control ...
Page 190: ...A13914AF 5 26 Quality Control Review Archived Data ...
Page 364: ...A13914AF 9 128 Maintenance As Needed As Required Maintenance ...
Page 384: ...A13914AF 10 20 System Status and Commands Unload All ...
Page 407: ......
Page 490: ...A13914AF Glossary 10 Glossary ...
Page 497: ......