B20063AC
2-1
CHAPTER 2
Preparing the Biomek NX
P
Instrument for Setup
Overview
The Beckman Coulter Field Service Engineer integrates and sets up the Biomek NX
P
instrument, but
does not physically assist in unpacking the instrument or placing it on the lab bench.
NOTE
The Biomek NX
P
instrument must be unpacked and set on the lab bench for the Beckman Coulter Field
Service Engineer, who might provide input either in person or over the telephone.
Biomek NX
P
instrument preparation includes
•
Moving the NXP Instrument Crate to the Unpacking Location
•
•
•
Moving the NXP Instrument to the Installation Site
•
Placing the NXP Instrument on the Lab Bench
•
Contacting Your Field Service Engineer
Moving the NX
P
Instrument Crate to the Unpacking Location
When the Biomek NX
P
instrument crate arrives, move it to an appropriate area for unpacking and
inspecting the Biomek NX
P
instrument.
NOTE
The crate containing the Biomek NX
P
instrument will not fit through standard doorways. It measures
38.75 in. (L) x 42 in. (W) x 60.63 in. (H), or 0.98 m (L) x 1.07 m (W) x 1.54 m (H).
If a long-bladed pallet jack is used to remove the Biomek NX
P
instrument shipping crate, it can be
lifted from either end. If a forklift is used to move the crate, it can be lifted from either side or either
end.
Summary of Contents for Biomek NXP
Page 4: ...B20063AC iv Revision History...
Page 10: ...B20063AC x Safety Notice Warnings and Cautions Found in this Manual...
Page 42: ...B20063AC 3 12 Preparing Cytomat Devices Unpacking Cytomat Devices...
Page 46: ...B20063AC 4 4 Preparing Other Integrated Devices Electrical Component Requirements...
Page 51: ......