PN B10093AE
A-1
APPENDIX A
Preinstallation Requirements
Preinstallation Requirements
Do not attempt to install this instrument. Its purchase price includes installation by Beckman Coulter
personnel. Installation by anyone other than an authorized Beckman Coulter representative invalidates
any warranty covering the instrument.
Preinstallation requirements have been sent prior to shipment of the instrument. The following
information is provided in case the centrifuge must be relocated.
The centrifuge will be installed upon initial purchase by a Beckman Coulter Field Service
representative after preinstallation requirements for power and site preparation have been met.
The following equipment is required for preinstallation:
•
Voltmeter
•
For single phase centrifuges: two 30-ampere circuit breakers
•
For three phase centrifuges: three 16-ampere circuit breakers
•
or
)
•
Drill for drilling holes in the floor for installation of anchoring kit bolts (see
, later in this section). A 9.5 mm (
3
/8-inch) drill is required for concrete
floors. A 6.4 mm (
1
/4-inch) drill is required for wood floors.
Electrical Requirements
Power to the centrifuge should originate directly from a main power line transformer at a power
source known to be clear of erratic loads, spikes, and electromagnetic interference. Make sure that
there are properly rated thermal circuit breakers at the service panel to protect the centrifuge
circuit. If fuses must be used instead of the specified circuit breakers, the fuses may require a rating
of greater than 30 amperes (for single-phase centrifuges) or greater than 16 amperes (for three-
phase centrifuges).
Terminate the open end of the harmonized cord with a certified single- or three-phase connector
suitable for the power supplied in the country of intended use (see
). Install only one
centrifuge per circuit.
Summary of Contents for Avanti J-26S XPI
Page 4: ...PN B10093AE iv Revision History ...
Page 12: ...xii Contents Avanti J Series Centrifuge Warranty Related Documents ...
Page 14: ...xiv Illustrations ...
Page 16: ...xvi Tables ...
Page 20: ...PN B10093AE xx Introduction Multi Compliance Label ...
Page 36: ...PN B10093AE 1 16 Description Available Rotors ...
Page 66: ...PN B10093AE 3 10 Troubleshooting JCF Z Rotor Identification ...
Page 82: ...PN B10093AE A 10 Preinstallation Requirements Using J2 Series Rotors in the Avanti J 26S XPI ...
Page 86: ...PN B10093AE Warranty 2 Beckman Coulter Inc Avanti J Series Centrifuge Warranty ...
Page 87: ......