background image

Operating Instructions 

 

 

Operating Instructions 

 

Please also refer to chapter 

General instructions

 
 

Switching the Industrial PC on and off 

Switch on 

The Industrial PC does not have its own mains switch. The Industrial PC 
will start when the equipment is switched on, or when it is connected to the 
power supply. 
 

Shutting down and 
switching off 

When the plant is switched off, or when it is disconnected from its power 
supply, the Industrial PC will be switched off. 
 
Control software such as is typically used on Industrial PCs permits various 
users to be given different rights. A user who may not close software may 
also not switch the Industrial PC off, since data can be lost from the hard 
disk by switching off while software is running. 
 
 

 

Warning

 

First shut down, then switch off the PC! 

If the Industrial PC is switched off as the software is writing a file to the 
hard disk, the file will be destroyed. Control software typically writes 
something to the hard disk every few seconds, so that the probability of 
causing damage by switching off while the software is running is very high. 
 

 

Warning

 

When you have shut down the Industrial PC, you have to switch off power 
supply for at least 10 seconds before rebooting the system. 
After resetting power supply the PC will start booting automatically. 
 

 

 

First switching on and driver installation 

 

When you switch on the Industrial PC for the first time, the pre-installed 
operating system (optional) will be started. In this case, all the required 
drivers for any additional, optional hardware components ordered with the 
PC will already have been installed. 
 
If the PC was ordered without operating system, you have to install the 
operating system and the driver software for any auxiliary hardware 
yourself. Please follow the instructions in the documentation for the 
operating system and the additional devices. 

 

12

 

CP63XX 

Summary of Contents for CP63 Series

Page 1: ...Installation and Operating instructions for Built in Panel PC CP63xx Version 1 3 Date 2006 01 11...

Page 2: ......

Page 3: ...npacking 8 Installation of the PC in the control cabinet 9 Earthing measures 9 Power supply 10 Connecting devices 11 Connecting cables 11 Verifying the voltage and connecting 11 Operating Instructions...

Page 4: ...he meaning of 443 BGB of the German Civil Code or a statement about the contractually expected fitness for a particular purpose in the meaning of 434 par 1 sentence 1 BGB In the event that it contains...

Page 5: ...equipment must first be switched off after which the Industrial PC can be uncoupled from the plant Pulling out the fieldbus connection plug uncouples the PC optional Items of equipment that have been...

Page 6: ...National regulations depending on the machine type Depending on the type of machine and plant in which the Industrial PC is being used there will be national regulations for the control of such machin...

Page 7: ...plant engineering applications Structure Opening the housing To open the PC housing release the screw 1 by one turn using a screwdriver The plastic cap 2 can be then be pulled forward thereby releasi...

Page 8: ...asic configuration The computer chassis can now be removed from the housing The power supply 1 and the hard disk 2 are located in the lower part of the chassis The slot motherboard 3 is located in the...

Page 9: ...o be used while a PC keyboard can be connected to the lower PS 2 connector 7 VGA connection VGA A 15 pin SUB D socket connector 5 allows a VGA monitor to be connected free slot free slot A free slot 7...

Page 10: ...ns in temperature make sure that moisture condensation does not form on or inside the device Prior to operation the unit must be allowed to slowly adjust to room temperature Should condensation occur...

Page 11: ...e unit is in its mounting position the ventilation openings must not be obstructed Warning Extreme environmental conditions should be avoided as far as possible Protect the rear of your PC from dust h...

Page 12: ...ower supply unit Output voltages from the 24 V power supply unit Current loading maximum 5 V 8 A 5 V 0 5 A 12 V 4 A 12 V 0 5 A 3 3 V 4 A 5 V VSB 0 5 A Pin assignment and fuse protection Pin assignment...

Page 13: ...ces that are to be connected Disconnect all the devices that are to be connected from the power supply Connect all the cables between the Industrial PC and to the devices that are to be connected Conn...

Page 14: ...software is writing a file to the hard disk the file will be destroyed Control software typically writes something to the hard disk every few seconds so that the probability of causing damage by swit...

Page 15: ...as to be replaced according to the rules of the board manufactorer Danger Danger of Explosion if battery is incorrectly replaced Replace only with same or equivalent type recommended by the manufactur...

Page 16: ...incorrect Other cause Remove floppy disk or CD and press any key Check the setup settings Call Beckhoff Service Computer boots software starts but control does not operate correctly Cause of the fault...

Page 17: ...C Beckhoff Support Support offers you comprehensive technical assistance helping you no only with the application of individual Beckhoff products but also with other wide ranging services world wide s...

Page 18: ...re to be observed during transport and storage as in operation The shock resistance during transport can be improved by means of suitably packing the Industrial PC The ambient temperature during stora...

Reviews: