background image

General Notes 

 

 

 
 

Operator's obligation to exercise diligence 

 

The operator must ensure that 

• 

the Control Panel is only used for its intended purpose (see 

Product Description

 section); 

• 

the Control Panel is only operated in a sound condition and in 
working order; 

• 

the instruction manual is in good condition and complete, and 
always available for reference at the place of installation of the 
Control Panel; 

• 

the Control Panel is operated, maintained and repaired only by 
suitably qualified and authorised personnel. 

• 

the personnel is instructed regularly about relevant occupational 
safety and environmental protection aspects, and is familiar with 
the operating manual and in particular the safety notes contained 
herein. 

• 

none of the safety and warning notes attached to the Control Panel 
are removed, and all notes remain legible. 

 

National regulations  
depending on the machine 
type 

Depending on the type of machine and plant in which the Control Panel is 
used, national regulations governing the controllers of such machines will 
apply, and must be observed by the operator. These regulations cover, 
amongst other things, the intervals between inspections of the controller. 
 
The operator must initiate such inspections in good time. 

 

 

Procedure in the event of a 
fault 

In the event of faults at the Control Panel, the list in the section 

Troubleshooting

 can be used to determine the measures to be taken. 

 

 

Operator requirements 

Read the operating 
instructions 

Anyone who uses the Control Panel must have read these operating 
instructions. 
 

Software knowledge 

Every user must be familiar with all the functions of the software installed 
on the Control Panel to which he has access. 
 

4

 

 CP60xx 

Summary of Contents for CP60 Series

Page 1: ...Installation and Operating instructions for Built in Control Panel CP60xx Version 1 4 Date 2007 10 19...

Page 2: ......

Page 3: ...ons 8 Mounting of the Control Panel 9 Connecting the Control Panel 10 Connecting cables 10 Protective Earthing 10 Operating Instructions 11 Functional description 11 Keyboard codes 11 Servicing and ma...

Page 4: ...et out in 443 of the German Civil Code or a statement about the assumed use according to the contract as set out in 434 para 1 clause 1 no 1 of the German Civil Code In the event that it contains tech...

Page 5: ...rol Panel side Items of equipment that have been switched off must be secured against being switched on again Danger Displays used for the control panel s LC display are operated with a voltage of up...

Page 6: ...warning notes attached to the Control Panel are removed and all notes remain legible National regulations depending on the machine type Depending on the type of machine and plant in which the Control...

Page 7: ...CP Link Pin Signal 1 TXD Power supply 2 GND CP Link B Data Power supply BNC connector Connector description CP Link connection CP Link The CP Link connection allows data transmission between Control P...

Page 8: ...C9900 K121 Length 50 m cable type H2000FLEX bend radius 50 mm C9900 K122 Length 65 m cable type H2000FLEX bend radius 50 mm C9900 K123 Length 70 m for easy installation at the PC and the mounting arm...

Page 9: ...n temperature make sure that moisture condensation does not form on or inside the device Prior to operation the unit must be allowed to slowly adjust to room temperature Should condensation occur a de...

Page 10: ...019 6 5 Display 272 3 221 42 258 3 207 CP6010 10 Display 370 336 32 356 322 CP6011 12 Display 372 2 342 2 32 358 2 328 2 CP6012 15 Display 430 4 403 32 416 4 389 Control Panel CP602x Dimensions a b t...

Page 11: ...ol Panel cutout dimensions Mounting of the Control Panel Release clamping levers Insert the Control Panel into the cutout Release the clamping levers with a No 2 5 Allen key Folding them out Turn the...

Page 12: ...plug Do not pull the cable Connecting cables The connections are located at the rear of the Control Panel and are documented in the Product Description section When connecting cables to the Control Pa...

Page 13: ...be operated with a touch screen pen The touch screen may only be actuated by finger tips or with the touch screen pen The operator may wear gloves but there must be no hard particles such as metal sha...

Page 14: ...ng of another key that is pressed at the same time This key brings up the Start menu of the operating system in use Windows 95 98 ME NT 2000 XP Pressing this key opens the property sheet of the active...

Page 15: ...t be replaced after a few years depending on the number of operating hours The fluorescent lamps of the 6 5 inch 12 inch and 15 inch displays can be replaced by a technically competent person i Note R...

Page 16: ...5 inch TFT display NL6448BC20 08 C9900 L364 12 inch TFT display LTD121C30S C9900 L366 15 inch TFT display LQ150X1LW71N Emergency procedures In case of fire the control panel should be extinguished wi...

Page 17: ...e running Setup settings are incorrect Other cause Remove floppy disk and press any key 1 Boot with boot diskette 2 Start SCANDISK Check the setup settings Call Beckhoff Service Computer boots softwar...

Page 18: ...e 5 D 33415 Verl Germany Phone 49 0 5246 963 0 Fax 49 0 5246 963 198 e mail info beckhoff com Beckhoff Support Support offers you comprehensive technical assistance helping you no only with the appli...

Page 19: ...resistance to impact during transport The ambient temperature during storage and transport must be between 20 C and 65 C i Note Pixel errors in the TFT display are production caused and represent no c...

Reviews: