background image

 

Operating Instructions 

 

5 Operating Instructions 

5.1  Switching the Panel PC on and off 

5.1.1 Switching on 

The Panel PC does not have its own mains power switch. As soon as the power supply is switched on the 
Panel PC is activated. 

5.1.2  Shutting down and switching off 

Control software such as is typically used on Industrial PCs permits various users to be given different 
rights. A user who may not close software may also not switch the Panel PC off, since data can be lost 
from the storage medium by switching off while software is running. 

First shut down, then switch off! 

 

Warning 

If the Panel PC is switched off as the software is writing a file to the storage medium, 
the file will be destroyed. Control software typically writes something to the storage 
medium every few seconds, so that the probability of causing damage by switching off 
while the software is running is very high. 

 

Switch off power supply 

 

Warning 

When you have shut down the Panel PC, you have to switch off power supply for at 
least 10 seconds before rebooting the system. 
After resetting power supply the Panel PC will start booting automatically. 

 

5.1.3  First switching on and driver installation 

When you switch on the Industrial PC for the first time, the pre-installed operating system (optional) will 
be started. In this case, all the required drivers for any additional, optional hardware components ordered 
with the PC will already have been installed. 

If the PC was ordered without operating system, you have to install the operating system and the driver 
software for any auxiliary hardware yourself. Please follow the instructions in the documentation for the 
operating system and the additional devices. 
 

5.2 Operation 

The operation of the Panel PC occurs via the Touch Screen. 

Risk of damaging the Touch Screen 

 

Warning 

The touch screen may only be actuated by finger tips or with the touch screen pen. The 
operator may wear gloves but there must be no hard particles such as metal shavings, 
glass splinters embedded in the glove. 

 

Properly installation of the system and the multi-touch device 

 

Warning 

Capacitive Touch Screens use the functional principle of capacitive alternation of the 
electrical field. Strong electrical fields can influence the functionality of the multi-touch 
devices. 
To ensure the correct function of the Touch Screen take care of a standardized 
installation of all parts of the system and an EMC-environment conforming to 
standards. 

CP32xx 

25 

Summary of Contents for CP32 Series

Page 1: ...Installation and Operating instructions for CP32xx Multi touch Panel PC Version 1 9 Date 2019 10 09...

Page 2: ......

Page 3: ...duct Description 7 2 1 Product overview 7 2 2 Appropriate Use 9 2 3 Access to the connectors 9 2 4 Access to the memory device and the battery 10 2 4 1 Removing the Cover 10 2 4 2 Replacing the batter...

Page 4: ...25 5 1 2 Shutting down and switching off 25 5 1 3 First switching on and driver installation 25 5 2 Operation 25 5 3 Servicing and maintenance 26 5 3 1 Cleaning 26 5 3 2 Maintenance 26 5 3 3 Replacin...

Page 5: ...XTS are registered trademarks of and licensed by Beckhoff Automation GmbH Other designations used in this publication may be trademarks whose use by third parties for their own purposes could violate...

Page 6: ...duals Risk of injury WARNING If you do not adhere the safety advise adjoining this symbol there is danger to life and health of individuals Hazard to individuals CAUTION If you do not adhere the safet...

Page 7: ...all parts of the equipment must first be switched off after which the Panel PC is to be disconnected from the equipment Disconnect the device by unplugging the connectors on the rear side of the Panel...

Page 8: ...t open the housing of the Panel PC Note For technical support contact Beckhoff Service 1 4 1 National regulations Depending on the type of machine and plant in which the Industrial PC is used national...

Page 9: ...ugh the mounting arm The Industrial PC connections up to six with IP 65 connectors are positioned in the large wiring space and are easily accessible The wiring area can be opened easily without dismo...

Page 10: ...mounting arm adapter for Rittal and Rolec mounting arm systems with 48 mm tube Passive cooling through heat sink internal fan for equal heat distribution to all the walls of the housing Wiring area f...

Page 11: ...ned for mounting arm installation Risk of explosion Danger The Control Panel must not be used where there is a risk of explosion 2 3 Access to the connectors The connectors of the Panel PC are located...

Page 12: ...d through the mounting arm tube before connecting them in the connection area The installation of the cover takes place in reverse order 2 4 Access to the memory device and the battery The slots for t...

Page 13: ...e pulled out Here changing the lithium battery is also possible The installation takes place in reverse order 2 4 2 Replacing the battery Danger of Explosion WARNING Replace battery only with the iden...

Page 14: ...accords to the IP65 standard Wiring when using 8 core cables Pin Wire Function Pin Wire Function 1 1 7 6 PC_ON 2 2 Battery Pack with UPS 8 7 Power Status 3 3 NC 9 NC 4 ge gn 10 NC 5 4 11 NC 6 5 24 V D...

Page 15: ...r set according to IEC24702 white No 09 45 145 1500 The connector and special tools for the assembly are available via the company Harting http www harting de as well as different distributors 2 5 3 A...

Page 16: ...tch cabel Network cable with IP65 connector C9900 K281 Network cable for CP32xx or CP72xx length 3 m assembled Harting push pull Ethernet connector IP65 second end RJ 45 IP20 C9900 K282 Network cable...

Page 17: ...ture condensation does not form on or inside the device Prior to operation the unit must be allowed to slowly adjust to room temperature Should condensation occur a delay time of approximately 12 hour...

Page 18: ...direct sunlight Avoid extreme environmental conditions Attention Extreme environmental conditions should be avoided as far as possible Protect the Panel PC from dust moisture and heat 4 1 Earthing me...

Page 19: ...e a diameter of 48 mm with a maximum tolerance of 0 1 mm 0 8 mm The mounting arm adapter enables to tilt the Panel PC at 20 and to rotate it about 165 Anti twist protection Note The mounting arm adapt...

Page 20: ...After feeding the connection cables of the Panel PC through the mounting arm tube the mounting arm tube will be positioned into the mounting arm adapter Insert the mounting arm tube all the way to the...

Page 21: ...Mounting 3 Tighten the Allen locking screw using the Allen key 2 2 4 Now the screw cap is tightened carefully clockwise using the hook wrench SW 58 62 3 3 CP32xx 19...

Page 22: ...e Industrial PC is provided with a power supply unit with integrated UPS order option you can realize an uninterruptible power supply UPS using the battery pack C9900 U330 Danger of Explosion WARNING...

Page 23: ...es an ON OFF switch for the machine Basically the main switch remains switched on and provides the power supply for the PC during shutdown Via the PC ON input of the power supply the PC gets the comma...

Page 24: ...assembled into the Industrial PC s power supply socket Then connect it to your external 24 V power supply Use same type of rechargeable battery Attention If a 24 V UPS is installed the same type of r...

Page 25: ...ording to the wiring diagram the circuit of PC_ON and Power Status is symbolical Connection of the Battery Pack and UPS Output Note Connection of the Battery Pack and UPS Output only in combination wi...

Page 26: ...the Panel PC from the power supply Connect all cables at the Panel PC and at the devices to be connected Ensure that all screw connections between connectors and sockets are tight Reconnect all devic...

Page 27: ...5 1 3 First switching on and driver installation When you switch on the Industrial PC for the first time the pre installed operating system optional will be started In this case all the required drive...

Page 28: ...tice correct polarity Handling of Lithium Batteries WARNING Lithium Batteries should not be recharged exposed to fire opened and they should be protected against sunlight and moisture The used battery...

Page 29: ...vers can be installed from the driver CD provided To install the UPS driver software execute file Beckhoff_UPS_vx xx xx exe from the subdirectory of UPS from the CD provided on the Industrial PC Drive...

Page 30: ...ff Service Panel PC boots software starts but control does not operate correctly Cause of the fault is either in the software or in parts of the plant outside the Panel PC Call the manufacturer of the...

Page 31: ...e Panel PC please visit our homepage Here you will find the actual drawings using the link http www beckhoff de german download technical_drawings htm Notice mounting orientation Warning The assembly...

Page 32: ...67 W UL compliance in progress Using a power supply class 2 or Fuse protection with 4 A according to UL 60950 2 chapter 2 5 table 2C Interfaces 1 x RJ 45 Ethernet 10 100 1000 Mbit Protection class IP...

Page 33: ...H Co KG Huelshorstweg 20 33415 Verl Germany Phone 49 0 5246 963 0 Fax 49 0 5246 963 198 E mail info beckhoff de Web http www beckhoff de Beckhoff Support Support offers you comprehensive technical ass...

Page 34: ...enerates uses and can radiate radio frequency energy and if not installed and used in accordance with the instruction manual may cause harmful interference to radio communications Operation of this eq...

Reviews: