Start-up 

Parameterisation

 

 

 

 
 

Beck GmbH 
Druckkontrolltechnik 
Ferdinand-Steinbeis-Straße 4 
71144 Steinenbronn

 

 

 

 

Operating instructions – Pressure Switch - Model-930...EX 

Rev.9 

Page 9 of 18 

 

  Documentation 

  Operating instructions, conformity declaration, EC design test certificate 
  System and zonal plan 
  Proof of adherence to explosion protection regulations (see Appendix 9.34) 

 

Equipment selection: category, Equipment Protection Level EPL, temperature 

class, explosion group, …

 

  Proof of adherence to intrinsic safety requirements 

5  Start-up 

Before voltage is applied to the equipment the following checks must be performed: 

  Check that screws are firmly seated in 

  Connecting terminals, protective earth conductor terminals and  

potential equalisation terminals 

  Housing cover 

  Check 

  The torque of the cable lead-in 
  The tightness of the seal provided by the cable lead-in 

  Check whether the equipment is ready for operation 

  The parameterisation for this application must have been performed 
  All interfaces such as inputs and outputs for control purposes must be connected 

and ready for operation 

5.1  Parameterisation 

Equipment parameterisation 

  Define all application-specific parameters. 
  Adjustment of the pressure ranges 

  With this pressure switch the pressure can be adjusted without a pressure gauge using a 

scaled adjustment knob 

  The switching differential can also be adjusted with a screwdriver by the adjustment screw 

with the identification “-

p+” 

 

Type 

Adjustment range 

for trip pressure 

    from         to 

Switching 

differential 

Tolerance 

band of 

930.80 EX 

20        300 Pa 

10 Pa 

±15 % 

930.83 EX 

50        500 Pa 

20 Pa 

±15 % 

930.84 EX 

30        400 Pa 

15 Pa 

±15 % 

930.85 EX 

200      1000 Pa 

100 Pa 

±15 % 

930.86 EX 

500      2500 Pa 

150 Pa 

±15 % 

930.87 EX  1000      5000 Pa 

250 Pa 

±15 % 

Note: 
Switching pressure specifications apply to vertical installation which is also the recommended position 
with pressure-pipe connections pointing downwards. If the switches are installed horizontally with AMP 
connection terminals uppermost, the switching values are approx. 20 Pa higher. 

 

  Once the power supply is applied, the equipment is ready for operation immediately. 

Summary of Contents for 930...EX Series

Page 1: ...einbeis Stra e 4 71144 Steinenbronn Operating instructions Pressure Switch Model 930 EX Rev 9 Page 1 of 18 Ident 060925 BA 930 R9 2016_englisch_Druckversion doc Operating Instructions The adjustable D...

Page 2: ...rectors Rainer Beck Hans Peter Funk Dr Ernst Thielicke Operating instructions Pressure Switch Model 930 EX Rev 9 Page 2 of 18 1 General instructions 3 1 1 Safety instructions 3 1 1 1 General safety in...

Page 3: ...ngs of the symbols that are used are as follows Useful important additional information Dangers and safety instructions Important please read Failure to comply with these instructions can have a detri...

Page 4: ...d out Dust deposits must be avoided installation location protection cleaning etc in order to prevent dangerous surface temperature increases For the installation procedure it is necessary to take car...

Page 5: ...otentially explosive gasses and dust natural gas bio gas solvents etc Liquid Flammable liquids petrol solvent etc Use in zones in potentially explosive areas Pressure switches are used to monitor the...

Page 6: ...ith the specified zones With intrinsically safe systems i the associated operating materials barrier must al ways be installed outside the potentially explosive area The labelling of the product must...

Page 7: ...1 Pressure connections 2 plastic pipe connection pieces 6 mm P1 for connection to higher pressure P2 for connection to lower pressure 4 2 2 Electrical connections When work is being performed such as...

Page 8: ...km Li 1 mH km Cable routing If there is a risk of mechanical damage the cable must be provided with additional protection protective tube etc The cable diameter must be complied with in order to provi...

Page 9: ...ion must have been performed All interfaces such as inputs and outputs for control purposes must be connected and ready for operation 5 1 Parameterisation Equipment parameterisation Define all applica...

Page 10: ...ues calibration o Triggering of alarms by known process parameters test pressure etc Correction of calibration values calibration must be carried out in the factory Documentation of what was done by w...

Page 11: ...plosive areas No potentially explosive atmosphere is present A release for work must have been issued by the operator The applicable regulations and all documentation for this equipment must be adhere...

Page 12: ...ble ends must be marked and it must be ensured that No electrical voltage is present Unintentional activation is not possible 8 1 Disposal The equipment is made from recyclable materials and is design...

Page 13: ...st 2D 30V 60mA 0 6W Electrical connection Cable conduit M20x1 5 or cap nut conduit with cable strain relief AMP flat plug 6 3 mm x 0 8 mm in accordance with DIN 46244 or push on screw terminals Arrang...

Page 14: ...her Pressure connections 2 plastic pipe connection pieces external diameter 6 0 mm Maximum operating pressure 10 kPa for all pressure ranges Mounting position Switching pressure specifications apply t...

Page 15: ...d drawings and accessories Beck GmbH Druckkontrolltechnik Ferdinand Steinbeis Stra e 4 71144 Steinenbronn Operating instructions Pressure Switch Model 930 EX Rev 9 Page 15 of 18 9 2 Dimensioned drawin...

Page 16: ...Declaration of Conformity Beck GmbH Druckkontrolltechnik Ferdinand Steinbeis Stra e 4 71144 Steinenbronn Operating instructions Pressure Switch Model 930 EX Rev 9 Page 16 of 18 9 3 Declaration of Con...

Page 17: ...trolltechnik Ferdinand Steinbeis Stra e 4 71144 Steinenbronn Operating instructions Pressure Switch Model 930 EX Rev 9 Page 17 of 18 9 4 EC design test certification Note More documentation for EC des...

Page 18: ...for Ignition protection class Zone 2 22 Gc Dc Zone 2 22 1 21 Gb Db Zone 1 2 21 22 Ex ia IIB Ex ia IIIB 0 20 Ga Da Zone 0 1 2 20 21 22 CHARACTERICTICS Intrinsically safe operating materials Associated...

Reviews: