background image

             

ASSEMBLY / OPERATING INSTRUCTIONS

             

To fit the Drop Side Panel continued...

To attach Feet to Base...

3

1

2

4

Slide the drop side up to allow the locating pin to 

match up with the small track on the drop side. 

Move end panel outwards and release when it 

locates in the track. 

Repeat for other end. 

Use eight x 25mm bolts to connect the feet 

between the fixed side and the lower support 

rail. 

Ensure the feet are facing towards the end of the 

cot. 

Turn the cot back on to its feet and tighten all bolts 

until firm.

Remember to replace mattress base bolt, insert 

and tighten 35mm bolt to lower support panel.

3a.

3b.

3c.

1a.

1b.

2a.

4a.

WARNING! 

Do not over tighten bolts. Over tightening bolts can cause panels to 

crack.

The cot is now ready for use.

Summary of Contents for 091567

Page 1: ...IMPORTANT RETAIN FOR FUTURE REFERENCE READ CAREFULLY PORTA CASA COT BED MODEL 091567...

Page 2: ...URE the cot is completely assembled and check that all parts are securely tightened before placing the child into the cot ENSURE medication string elastic small toys or small items such as money etc a...

Page 3: ...without notice as a result of our ongoing policy of product improvement Contents Assembly contents list Assembly Operating instructions How to care for your Porta Casa Cot Bed Congratulations on your...

Page 4: ...ct Customer Service In Australia contact CNP Brands on 1300 667 137 in New Zealand contact Wainhouse Distribution on 0800 567 5000 Supplied loose in box End Panel Left End Panel Right x 1 x 1 x 1 x 1...

Page 5: ...m Bolt Assembly bolt for fixed panel 25mm Bolt Assembly bolt for bottom feet 35mm Bolt Filling Bolt Nut Pre assembled x 4 x 8 x 8 x 6 x 2 x 4 x 2 x 2 Allen Key Wooden Dowel Pre assembled Drop Side Gui...

Page 6: ...n the end panels and using four x 35mm bolts to connect through the end panel into the mattress base Tighten bolts until firm It is advisable that two people assemble the cot in the room in which it i...

Page 7: ...m bolt Do not secure the other end of the lower support rail yet Place the drop side between the end panels making sure the small slot in the drop side panel track is facing toward the mattress base A...

Page 8: ...ack Repeat for other end Use eight x 25mm bolts to connect the feet between the fixed side and the lower support rail Ensure the feet are facing towards the end of the cot Turn the cot back on to its...

Page 9: ...nwards with your leg allowing it to lower into place Mattress base in High Position The base height is set for when your baby is young and cannot sit up unaided Mattress base in Low Position This is t...

Page 10: ...d of the cot Carefully move end panel outwards to release the locating pin from the track Repeat for other side With both locating pins released slide the drop side panel down to release the plastic g...

Page 11: ...ts and nuts from the edge of the end panels Insert the mattress retainer dowel into the end panel Secure with 1 x 35mm bolt With the opposite end move the end panel outwards to allow the mattress reta...

Page 12: ...soap solution if necessary Do not use abrasive cleaners Always store product in a clean dry place Always check parts regularly for tightness of screws nuts and other fasteners tighten or replace if r...

Page 13: ...greements These include distribution lines for 4moms Brica Cybex Evenflo Good Baby Lascal Maclaren Motorola Munchkin OiOi and Summer Infant Our own brands including Childcare have gone from strength t...

Page 14: ...ce 1300 667 137 W www cnpbrands com au E info cnpbrands com au F www facebook com CNPBrands I cnp_baby Distributed in New Zealand by Wainhouse Distribution 2 6 Argyle St Morningside PO Box 41 014 St L...

Reviews: