III. STEPS OF INSTALLATION
A. Location of Installation
Check and insure the installation location (concrete, layout, space size etc.) is
suitable for lift installation.
B. Check the Parts Before Assembly
1, The equipment should be unload and transfer by forklift. (See Fig.6)
2. Packaged lift and Hydraulic Power Unit
(See Fig. 6)
.
3. Open the outer packing carefully
(See Fig. 7)
.
Fig. 6
Fig. 5
Shipment Parts List
Drive-in
Ramp
Offside
Platform
Column
Cross
Beam
Parts box
Power-side
Platform
Fig.7
√