Brook House,
Dunmurry Industrial Estate,
Dunmurry,
Belfast BT17 9HU
T +44 (0)28 9061 6505
F +44 (0)28 9061 6518
E [email protected]
elkay.co.uk
BROOK DESIGN HARDWARE LTD
B
D
H
B
D
H
BROOK DESIGN
HARDWARE LTD
B
D
H
BROOK DESIGN
HARDWARE LTD
BDH
BROOK DESIGN
HARDWARE LTD
B
D
H
Technical Helpline
For further help or assistance or information on this or other products in the range
please call the Elkay Technical team on +44 (0)28 9061 6505. Please call the
Technical helpline before returning any products to your stockist. These instructions
are available in other languages. Please refer to our website www.elkay.co.uk
Instrukcje są również dostępne w innych językach. Prosimy o zapoznanie się z naszą
stroną internetową www.elkay.co.uk lub www.elkaypolska.pl
Important Notice
All wiring should be carried out by a competent
person or a qualifi ed electrician and should be
fi tted to current IEE wiring regulations BS 7671.
The circuit should be isolated before carrying out
any work. Failure to adhere to the instructions
will invalidate the warranty.
Elkay (Europe), 51C Milicka, Trzebnica, 55-100, Poland
Diagram 1
Diagram 2 – Time settings
Please note:
The black bar denotes
the position of the dip switch.
LIVE IN
NEUTRAL
LIVE OUT
5 - 7m
4 - 6m
5 - 7m
3 - 4m
5 - 7m
4 - 6m
5 - 7m
3 - 4m
LIVE IN
LIVE OUT
NEUTRAL
7 metres approx
.
2.4 metres
7 metres approx.
CEILING
FLOOR
LIVE IN
NEUTRAL
LIVE OUT
LIVE IN
LIVE OUT
Battery
LIVE IN
LIVE OUT
DIL
switches
Battery
NEUTRAL
2 mins 5 mins 10 mins 15 mins 20 mins 25 mins 30 mins 40 mins
ON DIP
4
3
2
1
ON DIP
4
3
2
1
ON DIP
4
3
2
1
ON DIP
4
3
2
1
ON DIP
4
3
2
1
ON DIP
4
3
2
1
ON DIP
4
3
2
1
ON DIP
4
3
2
1
50 mins 60 mins 70 mins 80 mins 90 mins 100 mins 110 mins 120 mins
ON DIP
4
3
2
1
ON DIP
4
3
2
1
ON DIP
4
3
2
1
ON DIP
4
3
2
1
ON DIP
4
3
2
1
ON DIP
4
3
2
1
ON DIP
4
3
2
1
ON DIP
4
3
2
1
Flexible Cable – It is always better to use cable
glands with fl exible cable, with the gland connected
at the bottom, rather than through the top.
Ensure sealing washers are used with all connections
and all glands and connections are done up
tightly with a spanner to ensure water tightness.
SWA Glands – SWA glands can be used but must
be IP rated. The IP rating for the SWA gland
guarantees only the connections to the SWA cable.
You will still need a nylon sealing washer to
maintain the IP rating from the gland to the switch
housing back box. As a general rule, nylon washers
work best with this type of application. Rubber
washers can deform when used with metal glands.
Connections must be done up tightly with a
spanner to ensure water tightness.
Operation of the Unit
1. Press the push button/touch pad and the red
LED light up briefl y. Your light source or appliance
will now be switched on.
2. At any time during the working of the light source
or appliance, the push button/touch pad can be
pressed to reset the timing sequence to the
originally set time, e.g. when the timing period
is 30 minutes, if push button/touch pad is
pressed 15 minutes into the sequence, the timer
will re-set for a further 30 minutes.
3. To end the timing sequence prematurely, press
and hold the push button/touch pad until the
red LED fl ashes continuously indicating the last
minute of operation. Your light source or appliance
will be switched off , after one minute.
4. At one minute prior to the end of the timing
sequence, the red LED will begin to fl ash
continuously for the last minute of operation.
The blue locator ring will then illuminate once
the light source or appliance has gone off .