background image

3. The factory harness crank position and speed sensor connectors can be found secured inside the frame 

near the front cylinder head. Disconnect the factory harness connector from the sensor connector and 

install the corresponding Bazzaz harness connectors inline (photos 3, 4 & 5).

4. Route the portion of the Bazzaz harness containing the power and neutral connectors toward the rear 

of the motorcycle along the right side. Locate the factory harness rear brake light switch power supply 

connector which can be found near the engine oil filler cap. Disconnect the factory harness connectors 

and install the Bazzaz harness power supply connectors in line (photos 6 & 7).

Speed

Crank

Factory

Bazzaz

Bazzaz Speed Installed

Bazzaz Crank Position

Installed

Bazzaz

Factory

Factory Brake Light Connector

Bazzaz Power Connector Installed

Photo 3

Photo 4

Photo 5

Photo 6

Photo 7

Summary of Contents for T143

Page 1: ...oftware and Its Instructions from website USB Cable O2 Eliminators 2 Scotchlok 2 Swingarm Stickers Read through all instructions before beginning installation This is not a replacement for the ECU Thi...

Page 2: ...BAZZAZ HARNESS CONNECTOR IDENTIFICATION TC Adjust Switch CYL 1 CYL 2 Shift Switch COIL HARNESS CYL 3 CYL 4 Neutral Injectors FUEL HARNESS Map select TPS Ground Speed Crank Power Z AFM...

Page 3: ...ol unit mounting bracket to the right side engine cover securing it in place us ing the two top cover bolts Insert the Bazzaz control unit into the bracket Connect the Bazzaz harness to the control un...

Page 4: ...the power and neutral connectors toward the rear of the motorcycle along the right side Locate the factory harness rear brake light switch power supply connector which can be found near the engine oil...

Page 5: ...und between the front and rear cylinders to the left side of the motorcycle 6 Secure the Bazzaz harness ground lug to a chassis ground Bazzaz recommends using the factory mount ing bolt for the radiat...

Page 6: ...oper identification and installation of the coil connectors The descriptions on the Bazzaz coil harness labels are color coded to match the color of the connectors in the photo of the factory service...

Page 7: ...intervals on either end to shorten for proper positioning photos 16 17 12 Reinstall the components removed in step one of these instructions The Bazzaz controller is capable of storing two maps These...

Reviews: