Warranty / product liability (exclusion) 

 

In addition to the above-mentioned regulations and safety notices the applicable regulations and rules of 
technology must be observed by the installing specialist company. 

The installer is responsible for the dimensioning of the mounting system. 

The installer is responsible for the connection of the interfaces between the mounting system and the 
building. This also includes the tightness of the building envelope. 

For flat roofs the roof insulation must be evaluated by the installer on site within his own responsibility 
regarding the material of the sealing layer, resistance, ageing, compatibility with other materials, overall 
condition of the roof insulation, need for a separating layer between the roof insulation and the mounting 
system. The required and necessary measures or precautions for the protection of the roof insulation for 
the mounting of the substructure of a PV system must be initiated by the installer with the aid of a specialist 
tradesman where necessary. BayWa r.e. Solar Energy Systems GmbH does not accept liability for faulty or 
inadequate measures and precautions for the protection of the roof insulation! 

The installer must review the friction coefficient used in the calculation for the verification of the slip safety 
of PV systems on flat roofs on site. Friction coefficients determined on site may be taken into account and 
must be provided to BayWa r.e. Solar Energy Systems GmbH for the calculation. BayWa r.e. Solar Energy 
Systems GmbH does not guarantee the correctness of the assumed values and is not liable for damage 
due to the use of incorrect values. 

The specifications of the module, cable and inverter manufacturers must be observed. If these contradict 
the mounting instructions, always consult the BayWa r.e. Solar Energy Systems GmbH sales team before 
mounting the novotegra mounting system or 

– in the case of components not supplied by BayWa r.e. Solar 

Energy Systems GmbH 

– the manufacturer concerned. 

During the preparation of the offers for novotegra by our sales staff the local conditions are not always 
sufficiently known, which is why changes to the offered quantities may result during installation. These 
changes relate mainly to the number of fasteners for the building envelope (for example roof hooks). In this 
case the additionally required components must always be installed in accordance with the dimensioning. 

BayWa r.e. Solar Energy Systems GmbH is not liable for incorrect or incomplete data collection sheets. 
Error-free and fully completed data collection sheets are essential for correct dimensioning. 

The information in the mounting instructions, the warranty terms and the information about the liability 
exclusion must be noted.

 

 

 

 

Summary of Contents for novotegra closed II

Page 1: ...I Mounting instructions novotegra for flat roofs closed II East West II...

Page 2: ...1 Required for installation 4 4 2 Installation system components installation variants 5 4 3 Installation system components optional 6 5 Installing the substructure 7 5 1 Installing the base rails and...

Page 3: ...lt WARNING describes a potential danger If it is not avoided death or serious injury might result CAUTION describes a potential danger If it is not avoided light or minor injury might result NOTE desc...

Page 4: ...ance lengths of bolts overhang and protrusions must be determined by the static calculation using the design software Solar Planit de The permissible roof inclination for the use of the mounting syste...

Page 5: ...the PV system the building owner and the specialist roof sealing company The substructure is installed without penetrating the roof The PV system is secured against wind suction by providing ballast e...

Page 6: ...Product group Base trough 150 30 Material Aluminium Profile rail Base trough connector set 150 30 I Material Aluminium Tool Socket bit AF 8 mm Rail connectors and expansion joint Base trough expansio...

Page 7: ...ace replace tool base trough 150 30 For place replace of base foot and module supports set in the base trough 150 30 Correct installation 4 2 Installation system components installation variants Figur...

Page 8: ...m Material Aluminium Module protection and rail top cover Self locking cable tie Cable protection Cable clip d 10 mm Cable protection Grounding connector set AF 18 Material V2A Tool Special lock nut A...

Page 9: ...nt eM module length 12 mm Observe the accident prevention regulations when sawing Connecting the base troughs Push the ends of the base troughs tightly together push the connectors under the ridge on...

Page 10: ...tion for East West II see MV 8 Wire adjacent modules while installing them Install the string cable first Fastening the modules on the row end Secure modules at the end of a row or at a break in the r...

Page 11: ...modules The required ballast depends on the system area and is specified in the ballast plan in kg and or number of stones The ballast can be laid out under in front of or behind the module to accommo...

Page 12: ...tightened Approval from manufacturer required for clamping in the corner section of the long frame side MV 3 Base troughs for cross drainage If the base troughs 150 30 for cross drainage end without P...

Page 13: ...module in addition to the clamps at the corners using the flat roof end clamp on the long side 1 Secure wind deflector with one screw at base trough and module support MV 7 Module supports East West...

Page 14: ...ind deflector module support 1 Lay the wind deflector under the module The module and wind deflector should be fastened to the support with flat roof end clamps short side and attached to the base tro...

Page 15: ...k Push component through long hole in the base trough Push ground wire through the opening suitable for 6 10 mm and attach the component with the self locking nut Ground wire tightening torque 20 Nm O...

Page 16: ...fication of the slip safety of PV systems on flat roofs on site Friction coefficients determined on site may be taken into account and must be provided to BayWa r e Solar Energy Systems GmbH for the c...

Page 17: ...15 NOTES...

Page 18: ...16 NOTES...

Page 19: ...17 NOTES...

Page 20: ...ion 3 2 Copyright BayWa r e Solar Energy Systems GmbH BayWa r e Solar Energy Systems GmbH Eisenbahnstrasse 150 D 72072 T bingen Germany Phone 49 7071 98987 0 Fax 49 7071 98987 10 solarenergysystems ba...

Reviews: