63 9810.0293 - Rev.00 - 08/09/2008
10
Settle the boiler onto concrete base.
Ambient
where is boiler in should not be dusty and moist.
Caution!
Waste gas way must be as short as
possible. Waste gas pipes must be installed as in
slanting direction towards chimney and connections
must have full imperviousness.
The chimney must be designed considering
technical specifications determined in DIN 4705 and
built according to DIN 18160.
*The boiler should be placed onto the concrete
base.
*The size of the concrete base is shown on the
table.
*After placing the boiler on to base, it should be
balanced from the ground surface.
B(Wide)
Concrete
base
Depth
Wide
Height
Summary of Contents for Linyitomat Plus
Page 3: ...63 9810 0293 Rev 00 08 09 2008 3 LĐNYĐTOMAT PLUS 20 40 60 80 ...
Page 4: ...63 9810 0293 Rev 00 08 09 2008 4 ...
Page 5: ...63 9810 0293 Rev 00 08 09 2008 5 Top view Front view Right side view Left side view ...
Page 29: ...63 9810 0293 Rev 00 08 09 2008 29 AUTOMATIC Electronic Control Board Manuel Automatic Control ...
Page 30: ...63 9810 0293 Rev 00 08 09 2008 30 Electricity connection circuit scheme ...
Page 31: ...63 9810 0293 Rev 00 08 09 2008 31 ...
Page 32: ...63 9810 0293 Rev 00 08 09 2008 32 Boiler installation scheme with hot water tank ...