EcoBlue Plus Combi
7
7219707 - 01 (04/15)
Introduction
1
1.5.3. User's Responsibility
To guarantee optimum operation of the installation, you must
observe the following instructions:
Read and observe the instructions given in the manuals
supplied with the appliance.
Seek the assistance of a qualified installer for the installation
and initial commissioning.
Ask the installer to explain the installation.
Have the required annual inspection and maintenance
carried out by a qualified installer and ensure the Benchmark
Service Record in the Installation Manual is completed - this
is a condition of the warranty !
Keep the manuals in good condition and near to the
appliance.
This appliance must not be used by people with a lack of
experience or knowledge, unless they are supervised by
someone familiar with the appliance or if they have been
instructed on how to operate the appliance correctly. Do not
allow children to operate or play with the appliance.
1.5.2 Installer's Responsibility
The installer is responsible for the installation and initial start up
of the appliance. The installer must adhere to the following
instructions:
Read and follow the instructions given in the manuals
provided with the appliance.
Carry out installation in compliance with the prevailing
legislation and standards.
Ensure the system is flushed and inhibitor added.
Install the flue/chimney system correctly ensuring it is
operational and complies with prevailing legislation and
standards, regardless of location of the boiler’s installation.
Only the installer should perform the initial start up and carry
out any checks necessary.
Explain the installation to the user.
Complete the Benchmark Commissioning Checklist in the
Installation Manual - this is a condition of the warranty !
Warn the user of the obligation to check the appliance and
maintain it in good working order.
Give all the instruction manuals to the user.