40
EcoBlue Heat
7219717 - 02 (08/15)
6
Installation
6.3
Filling the System
See Section 5.2.6. for details of treating the system,
Section 5.2.7. for open vent system details, Section 5.2.9. for
sealed system details and Section 5.4.4. for filling the
condensate trap.
6.4
Completing the Installation
6.4.1 Completion
1. Before turning on the electrical and gas supply to commission
the boiler, check that all the installation requirements for the
chosen heating system and flue options have been satisfied.
2. Ensure that the system is vented to expel any excess air.