10
EcoBlue Heat
1
Introduction
7219717 - 02 (08/15)
1.5.2 Installer's Responsibility
The installer is responsible for the installation and initial start up
of the appliance. The installer must adhere to the following:
Read and follow the instructions given in the manuals
provided with the appliance.
Carry out installation in compliance with the prevailing
legislation and standards.
Ensure the system is flushed and inhibitor added.
Install the flue/chimney system correctly ensuring it is
operational and complies with prevailing legislation and
standards, regardless of location of the boiler’s installation.
Only the installer should perform the initial start up and carry
out any checks necessary.
Explain the installation to the user.
Complete the Benchmark Commissioning Checklist - this is a
condition of the warranty !
Warn the user of the obligation to check the appliance and
maintain it in good working order.
Give all the instruction manuals to the user.
1.6
Homologations
1.6.1 Certifications
EC - Declaration of Conformity
Baxi Heating Uk Limited being the manufacturer / distributor
within the European Economic Area of the following
Baxi EcoBlue Heat ErP
declare that the above is in conformity with the provisions of the
Council Directive
2009/142 EC 92/42 EEC 2004/108 EC 2006/95 EC
2009/125/EC 2010/30/EU
and has been subject to the following conformity procedures laid
down in
Annex 2 - Article 3 of 2009/142 EC
under the supervision of the British Standards Institution, a
Notified Body authorized by the United Kingdom Competent
Authority, and carrying the Notified Body Number 0086.
1.6.2 Directives
The boiler meets the requirements of Statutory Instrument “ The
Boiler (Efficiency) Regulations 1993 N
o
3083” and is deemed to
meet the requirements of Directive 92/42/EEC on the energy
efficiency requirements for new hot water boilers fired with liquid
or gaseous fuels:-
Type test for purpose of Regulation 5 certified by:
Notified Body 0063.
Product/Production certified by:
Notified Body 0086.
For GB/IE only.