Baxi Bioflo Assembly Instructions Manual Download Page 5

© Baxi Heating UK Ltd 2010

Bioflo

Biomass Pellet

Central Heating

System Boiler

Supplementary Operating Instructions 

for the UK

Read the Operating Manual and these Supplementary

Instructions carefully before using the boiler

USER OPERATING INSTRUCTIONS 

Please read the important notices overleaf before referring to the 
Operating Manual book for detailed operating instructions.

RECOMMENDED FUELS

The boiler is designed to burn only specialised compressed wood pellets which are
detailed in the main instruction book. These pellets must meet the DINplus quality
standard.

The recommended suppliers for the pellets is: -

For a local distribution outlet please telephone on;
Tel: +44 (0)28 6641 1001

For an interactive map of local distributors please view the following website;
Web site:  http://www.brites.eu/

UNDER NO CIRCUMSTANCES SHOULD YOU ATTEMPT TO BURN ANY
OTHER TYPE OF FUEL INCLUDING PELLETS THAT DO NOT MEET THE
DINPLUS STANDARD.

SERVICE AND MAINTENANCE

This appliance should only be installed, serviced and maintained by HETAS Ltd
trained operatives. Contact Heateam for suitable trained operatives on 0844 871
1568.

WARNING NOTE

Properly installed, operated and maintained this boiler will not emit fumes into the
dwelling. Occasional fumes from de-ashing and re-fuelling may occur.  However,
persistent fume emission is potentially dangerous and must not be tolerated. If
fume emissions persist, then the following immediate action should be taken:-

a)

Open the doors and windows to ventilate room

b)

Let the fire go out, remove and safely dispose of fuel from the appliance

c)

Check flue or chimney blockage clean if required

d)

Do not attempt to relight the fire until the cause of fume emission has been 
identified and corrected. If necessary seek expert advice.

The most common cause of fume emission is flueway or chimney blockage. For
your own safety these must be kept clean at all times.

General

Before lighting the boiler check with the installer that the installation work and
commissioning checks have been carried out correctly and that the chimney has
been swept clean, is sound and free from any obstructions. As part of the boilers’
commissioning and handover the installer should have shown you how to operate
the boiler correctly.

Do not light the boiler if there is a possibility that any part of the heating system
may be frozen.

Summary of Contents for Bioflo

Page 1: ...al chimneys System chimney products 2 2004 metal liners and connecting flue pipes BS 8303 Code of practice for installation of domestic heating and cooking appliances burning solid mineral fuels BS EN 15287 1 2007 Chimneys Design installation and commissioning of chimneys Chimneys for non room sealed heating appliances BS 8423 2002 Fireguards for fires and heating appliances for domestic use BS EN...

Page 2: ...m flue gas connector that allows connection to either a suitably lined masonry chimney or a prefabricated factory made insulated metal chimney in accordance with the instructions It will be neccessary to fit an adaptor to the flue gas connector for chimney diameters greater than 125mm Maximum diameter is 150mm Because the boiler operates at high efficiencies the temperature of the flue gases is at...

Page 3: ...ber Combustion Air Supply This is an open flued appliance The air supply can be provided either directly from outside via an air duct or from the room of installation In order for the boiler to perform efficiently and safely there must be an adequate air supply into the room in which the boiler is installed to provide combustion air The provision of air supply to the boiler must be in accordance w...

Page 4: ...iler and the associated heating system must be carried out by a registered competent electrician and in accordance with the requirements of the latest issue of BS 7671 Power cable 3 core to appliance 4 core cable to wiring centre from appliance ie L1 N and E to wiring centre external controls L2 switched live back to the appliance see section 4 7 in Installation Instructioins Frost protection must...

Page 5: ...for suitable trained operatives on 0844 871 1568 WARNING NOTE Properly installed operated and maintained this boiler will not emit fumes into the dwelling Occasional fumes from de ashing and re fuelling may occur However persistent fume emission is potentially dangerous and must not be tolerated If fume emissions persist then the following immediate action should be taken a Open the doors and wind...

Page 6: ...for a prolonged period of time ie during the summer months then it should be given a thorough clean to remove ash and unburned fuel residues Empty the hopper of unburned fuel To enable a good flow of air through the appliance to reduce condensation and to avoid door seals becoming stuck and subsequently damaged leave the filling hatch and combustion chamber doors slightly ajar These actions will r...

Reviews: