8.0 Installation - Page 18
8.3 Preparing The Boiler
1. Remove the outer carton.
2. Hinge the lower door panel open and remove the outer
case fixing screws (Fig. 22). Close the door against its
retaining magnets.
3. Slide the outercase upwards to disengage the hooks on
the backplate and remove (Fig. 23).
4. Remove the sealing plugs from the copper bends.
5. Stand the boiler on its base by using the rear lower edge
as a pivot.
NOTE: A small amount of water may drain from the
boiler in the upright position.
Baxi Limited declare that no substances harmful to
health are contained in the appliance or used during
construction of the appliance.
Summary of Contents for Barcelona System
Page 7: ...4 0 Technical Data Page 7 ...
Page 8: ...5 0 Dimensions and Fixings Page 8 ...
Page 23: ...9 0 Electrical Page 23 ...
Page 24: ...9 0 Electrical Page 24 9 2 Illustrated Wiring Diagram ...
Page 38: ...14 0 Fault Finding Page 38 ...
Page 39: ...14 0 Fault Finding Page 39 ...
Page 40: ...14 0 Fault Finding Page 40 ...
Page 41: ...14 0 Fault Finding Page 41 ...
Page 42: ...14 0 Fault Finding Page 42 ...
Page 43: ...14 0 Fault Finding Page 43 ...
Page 44: ...Barcelona System Baxi Heating Ltd 44 45 14 0 Fault Finding Page 44 45 ...
Page 45: ......