background image

Sailing yacht Bavaria 38 

 

Bavaria Yachtbau GmbH 

(

45

– 33 –

 

2.6.2 Operation 

Gas installations require care. That’s why you should follow this sequence: 

 

 
 
 
 
 
 

 

 

 
 
 
 
 
 

Attention: 

Do not use liquids containing ammonia for checking the pipe. 

Never handle with open light and do not smoke if you look for leakage  
or if you connect a new gas cylinder. 

 

 

And here is some more advice on how to prevent difficulties with the gas installation: 

 

Close all gas valves if the stove is not in use. In a case of emergency you should close the valves 
immediately. 

The stove valves have to be closed before the gas cylinder valve is opened. 

Check the L.P.G. installation for possible leakages regularly. Check all connections with soap suds or 
the like (for doing so the stove valves have to be closed – all other valves of the installation have to 
be open). 

If you find any leakages close all valves and have the installation repaired by a specialist before 
further use. 

Since the flames consume oxygen a proper airing and deaeration is necessary.  Do not use the stove 
for heating the cabin. 

Valves of empty gas cylinders have to be closed and disconnected from the installation. Have the 
covers ready. 

Do not use the gas cylinder casing for storing other equipment. 

Never leave your yacht unattended if the stove is in use. 

Check the hose pipes at least once a year . Have them replaced if necessary. 

If you install a new stove make sure that is has got the same working pressure. 

Check the exhaust gas pipes at least once a year. Replace them if they a defective. 

 
2.7 Fire protection 
 

When building the yacht special attention was payed to avoid the risks of fire. This includes the choice of 
materials, the distance of stove flames to the surrounding built-in furniture and an island position of the 
engine. The engine room has got a lining with fire resistant  insulating material.  
 
As the owner of the yacht you should keep this state and pay attention to the following advice: 

Attention 

-  Open the stop valve in the gas cylinder casing 
-  Open the valve before the stove  
-  Open a stove valve and lighten the gas 
-  Keep the valve open until the glow timer allows further burning. 

Attention 

For finishing follow the same (above mentioned) sequence from the 
valve in the gas cylinder casing to the stove valve to allow all gas in the 
piping to escape and burn. 

Summary of Contents for BAVARIA 38

Page 1: ...Manual for owners and skippers Sailing yacht BAVARIA 38 Bavaria Yachtbau GmbH Bavariastr 1 D 97232 Giebelstadt Tel 49 0 9334 942 0 Fax 49 0 9334 942 116 E Mail info bavaria yachtbau com...

Page 2: ...1 Description of the system 2 3 2 Rudder blade and rudder bearing 2 4 Bilge pump bilge lines 2 4 1 Description of the pumping arrangement 2 5 Electric installation 2 5 1 AC installation 2 5 2 DC inst...

Page 3: ...possibilities As the scope of supply depends on the order the equipment of your yacht can deviate with some descriptions and illustrations In order to be able to adapt our yachts to the constantly pro...

Page 4: ...above and vessels largely self sufficient Certification For yachts with a length of more than 12 m hull length the EC Directive intends the certification module B EC type examination in combination w...

Page 5: ...ts is the code number of the certifying body in this case the IMCI International Marine Certification Institute see Declaration of Conformity Warnings Many chapters of this manual will support a troub...

Page 6: ...nges on board which touch the essential safety requirements and are not settled amongst ourselves Description of the boat Bavaria 38 Type Keelyacht Serial number of the hull DE BAVX38F6E303 Category o...

Page 7: ...Sailing yacht Bavaria 38 Bavaria Yachtbau GmbH 45 7...

Page 8: ...Sailing yacht Bavaria 38 Bavaria Yachtbau GmbH 45 8...

Page 9: ...board 12217 Part 2 3 3 Buoyancy and flotation 12217 Part 2 3 4 Openings in the hull 12216 9093 1 9093 2 3 5 Flooding 11812 12217 12216 15083 3 6 Manufacturer s maximum recommended load 14946 3 7 Place...

Page 10: ...20S D Reduction ratio 2 48 1 propeller 3 bladed fixed propeller made from an aluminium alloy option folded propeller 1 1 4 Electrical installation 220 110 V option AC installation shore connection opt...

Page 11: ...avaria 38 Bavaria Yachtbau GmbH 45 11 1 2 General arrangement 1 2 1 Rigging plan Reference The valid measuring of the foresail reefing gear are on the enclosure note at the carton of the Furlex foresa...

Page 12: ...Sailing yacht Bavaria 38 Bavaria Yachtbau GmbH 45 12 1 2 2 Deck arrangement...

Page 13: ...tschiene 1 26 Embout avant de rail genois Front endstop g track Schienenendst ck 2 27 Embout arriere de rail genois Aft endstop g track Schienenendst ck mit Umlenkbloken 2 28 Embouts de rail gv Endsto...

Page 14: ...sche Shower 7 K hlbox Cooling 8 Gasbackofen Gas cooker with oven 9 Sp le Sink 10 Sitzgruppe Seating 11 Schrank Hanging locker 12 Doppelbett Double berth 13 Ankerkasten Chain locker 14 Schrank Shelf 15...

Page 15: ...Shower 7 K hlbox Cooling 8 Gasbackofen Gas cooker with oven 9 Sp le Sink 10 Schrank Hanging locker 11 Doppelbett Double berth 12 Ankerkasten Chain locker 13 Schrank Shelf 14 Schrank Hanging locker 15...

Page 16: ...ing Inside the mast Option Main halyard Spinnaker halyard attached Genoa halyard Spinnaker uphaul Boom lift Spinnaker downhaul 3 additional weighing lines Inside the boom 2 reef lacings battened sail...

Page 17: ...Kraftstoffeinf llstutzen 5 Feed back fuel Kraftstoffr ckf hrleitung 6 Fuel tank filling hose Kraftstoffeinf llschlauch 7 Fuel tank ventilator Tankentl ftung 8 Fuel filter Kraftstofffilter 9 Fuel cock...

Page 18: ...rruption of the operation of the pressure pump is done by cutting off all ducts All pipes hoses should be checked for leaks if the pump continuous working though all ducts were cut off properly The pu...

Page 19: ...ulator tank pressure switch 4 Frischwasserpumpe Fresh water pump 5 Einf llstutzen Plate inlet 6 Tankentl ftung Tank venting 7 Boiler Water heater 8 Cockpitdusche Shower Note Exchange the water in tank...

Page 20: ...lass Outlet 2 Kugelhahn Ausgang WC Toilet drain valve 3 F kalientank Waste water tank 4 Kugelhahn Ausgang F kalientank Waste water drain valve 5 Kugelhahn Eingang WC Toilet Water drain valve 6 Kugelha...

Page 21: ...wasser Y Waste valve Y 5 Kugelhahn Ausgang Waschbecken Basin drain valve 6 F kalienpumpe Waste water drain pump 7 Kugelhahn Ausgang F kalientank Waste water drain valve 8 Kugelhahn Ausgang el Duschpum...

Page 22: ...r 2 3 1 Description of the system The rudder is a suspended balanced hydrofoil midship rudder It is operated by hand from the steering wheel at the steering post in the cockpit Transmission of power i...

Page 23: ...has a capacity of 75 l min A draw bucket is an ideal means for bailing out water It should always be ready in a cockpit seat locker Attention Close all sea valves if you leave your yacht for a longer...

Page 24: ...ion of additional electric devices There are only automatic fuses used So you only have to press them in case of a breakdown If a fuse blows repeatedly you should spot the cause or consult a specialis...

Page 25: ...arm devices As long as the diesel engine is in operation you must not disconnect the 12 V charging circuit Before starting a voyage you should always check the battery voltage the correct function of...

Page 26: ...Sailing yacht Bavaria 38 Bavaria Yachtbau GmbH 45 26 2 5 6 Distribution of electric devices 2 cabins...

Page 27: ...Sailing yacht Bavaria 38 Bavaria Yachtbau GmbH 45 27 3 cabins...

Page 28: ...Ah 2 ou 3 16 Battery charger option Chargeur option 1 17 Electric panel Panneau lectrique 1 18 Main switch Interrupteur principal 1 19 Auto pilot Pilote automatique 1 20 Electronic compass option Comp...

Page 29: ...Sailing yacht Bavaria 38 Bavaria Yachtbau GmbH 45 29 2 5 7 Wiring plans...

Page 30: ...Sailing yacht Bavaria 38 Bavaria Yachtbau GmbH 45 30 2 5 8 Distribution plans...

Page 31: ...Sailing yacht Bavaria 38 Bavaria Yachtbau GmbH 45 31 2 5 9 AC distribution...

Page 32: ...between the gas cylinder and the copper pipe and between copper pipe and stove is printed onto the hoses They have to be replaced after the expiry date The reducing valve in the gas cylinder casing ha...

Page 33: ...ves of empty gas cylinders have to be closed and disconnected from the installation Have the covers ready Do not use the gas cylinder casing for storing other equipment Never leave your yacht unattend...

Page 34: ...e capacity as the discussed ones It is the yacht owner s or skipper s duty to make sure that all extinguishers are freely accessible to inform all persons on board about the position and use of all fi...

Page 35: ...s a trouble free engine operation Moreover the engine noise is reduced All hose connections of the system a secured with double stainless steal clips 2 10 Exhaust gas system The yacht is fitted with a...

Page 36: ...ay special attention to them All board ducts in the underwater part with the exception of the duct for the transmitter of the echo sounder consist of brass made screwed joints with spherical sea valve...

Page 37: ...g Sp le Sink drain 7 Echolot Depth sounder 8 Geschwindigkeitsmesser Speedometer 9 Ausgang Auspuff Exhaust drain 3 cabins 1 K hlwasserfilter Cooling water strainer 2 Eingang Wc Toilet water drain 3 Aus...

Page 38: ...The wet exhaust pipe of the diesel engine reduces the engine sound considerably Additionally rubber bearings elastic couplings and the engine room insulation minimise sound emissions Nevertheless you...

Page 39: ...seal between the caulking material and the sides of teh joint may break down allowing water to enter Paints and lacquers are decorative coatings which when applied to a teak deck dry to form a continu...

Page 40: ...made out of the right material or the stainless steel has not been treated correct Before you will buy the fitting ask f e if the fitting has been polished electrical 4 2 Wearing and spare parts As a...

Page 41: ...ry Empty all cooling water of the engine and follow the instructions of the manufacturer Slacken all belts lighting engine and other engine driven devices Winter storage Observe all notes in the engin...

Page 42: ...e situations with suitable means We are constantly working on further developments of our sailing yachts We hope you will understand that we have to reserve the right to carry out changes as far as fo...

Page 43: ...ntract 1 First launch 2 Date of delivery to the owner 3 Type of boat 4 Hull identification number 5 Commission number 6 Name of the yacht 7 Manufacture and type of engine 8 Engine number 9 Gear manufa...

Page 44: ...Sailing yacht Bavaria 38 Bavaria Yachtbau GmbH 45 44...

Page 45: ...Bavaria 38 Bavaria Yachtbau GmbH 45 45 Please return signed to address of the dealer Acknowledgement of receipt Name Address Owner of the yacht BAVARIA 38 HIN DE BAVX38F6E303 Signature _______________...

Reviews: