background image

Bavaria 32 

 

Bavaria Yacht Bau GmbH 

(39) 

– 29 –

 

2.9 Engine cooling system 
Engine cooling 

The engine has got a two-circuit cooling system. Water enters through the saildrive, is led to the heat 
exchanger and then injected into the exhaust gas pipe. Together with the exhaust gas the cooling sea 
water is exhausted via the silencer and the exhaust pipe at the stern. This guarantees a trouble-free engine 
operation. Moreover the engine noise is reduced. 
All hose connections of the system a secured with double stainless steal clips. 

 
 
 
 
 
 

 
 

2.10 Exhaust gas system  

The yacht is fitted with a “wet“ exhaust gas system, i.e. cooling sea water is injected into the exhaust gas 
elbow causing a cooling of exhaust gases. This mixture is led down into a silencer/water lock, runs 
through a pipe in the locker seat on the starboard side of the aft cabin, is led upwards at the stern and 
escapes to the side above the water-line.  
The exhaust gas hose consists of a synthetic rubber material with an integrated steal spiral. 
The hose is heat-resistant ( for some time) and should be checked and replaced if necessary. 
A constant flow of sea water has to be guaranteed. The hose is secured at its joints with two clips. 
If there is an interruption of the sea water flow, the temperature sensor in the exhaust gas hose will release 
an visual and acoustic warning. In this event you should stop and switch off the engine immediately until 
the problem has been settled ( see manual of the engine manufacturer). 

 

 

Attention:  

 
 

 

 

2.11 Ventilation/Airing 

We have taken the following measures for a proper ventilation of all rooms: 
 

Chain locker 

A certain ventilation is achieved through the hawser port in the cover of the chain locker and through its 
bilge holes. 
 

Living cabins/ Salon and forward quarter  

One ventilator

 

 

Aftcabin 

1 side light /bull’s eye showing to the cockpit 
 

Components: 

1 deck ventilator, 4 side lights, 2 folding hatches  

Attention  

 

-  Check and clean the sea water filter in regular intervals, depending on 

the water quality. 

-  Before starting the engine make sure that the cooling water inlet is open. 
-  Have a short look into the engine room for possible leakage. 

When the engine is running it is highly recommendable to check 
regularly if cooling water is escaping with the exhaust gas.

 

A regular Inspection if saltwater comes out of the exhaust, is urgently advisable. 

Summary of Contents for BAVARIA 32

Page 1: ...Manual for Owners and Skippers Sailing yacht BAVARIA 32 Bavaria Yachtbau GmbH Bavariastr 1 D 97232 Giebelstadt Tel 49 0 9334 942 0 Fax 49 0 9334 942 116 e mail info bavaria yachtbau com...

Page 2: ...3 Steering gear 2 3 1 Description of the system 2 3 2 Rudder blade and rudder bearing 2 4 Bilge pump bilge lines 2 4 1 Description of the pumping arrangement 2 5 Electric installation 2 5 1 AC instal...

Page 3: ...lities As the scope of supply depends on the order the equipment of your yacht can deviate with some descriptions and illustrations In order to be able to adapt our yachts to the constantly progressin...

Page 4: ...n Actually the EC Directive intends for yachts of this size the certification module Aa only That means that the manufacturer certifies the correspondence of construction and equipment with the Direct...

Page 5: ...code number of the certifying body in this case the Lloyd s Register Quality Assurance GmbH Yacht Services see Declaration of Conformity Warnings Many chapters of this manual will support a troublefr...

Page 6: ...ries out changes on board which touch the essential safety requirements and are not settled amongst ourselves Description of the boat Bavaria 32 Type Keelyacht Series number of the hull DE BAVU32Y0E30...

Page 7: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 7...

Page 8: ...rt 2 3 3 Buoyancy and flotation 12217 Part 2 3 4 Openings in the hull 12216 9093 3 5 Flooding 11812 12217 12216 8849 15083 3 6 Manufacturer s maximum recommended load 14946 3 7 Place for life rafts Si...

Page 9: ...ded fixed propeller made from an aluminium alloy Option folded propeller 1 1 4 Electrical installation 220 110 V option AC installation shore connection option socket CEE plug current operated 230 V e...

Page 10: ...2 Bavaria Yacht Bau GmbH 39 10 1 2 General arrangement 1 2 1 Rigging plan Reference The valid measuring of the foresail reefing gear are on the enclosure note at the carton of the Furlex foresail reef...

Page 11: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 11 1 2 2 Deck arrangement...

Page 12: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 12 1 2 3 Accomodation plan...

Page 13: ...per shroud 2x permanent backstay tackle 1x Running Rigging Inside the mast Option Main halyard Spinnaker halyard attached Genoa halyard Spinnaker uphaul Boom lift Spinnaker downhaul 3 additional tripp...

Page 14: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 14 Engine plant...

Page 15: ...the pantry An interruption of the operation of the pressure pump is done by cutting off all ducts All pipes hoses should be checked for leaks if the pump continuous working though all ducts were cut...

Page 16: ...s supplied via a suction pipe from the upper edge of the tank Due to the short distance a fire proof fuel pipe is used This is led via a wide meshed filter water separator fuel pump and fine filter to...

Page 17: ...d secured at the top of the tiller wheel The steering wheel got a built in brake which you can fasten Make always sure that this brake is not tight especially when sailing with the auto pilot This wou...

Page 18: ...installed at the transom of the yacht The power is supplied into a shore connection unit placed under the chart table The plug box is operational as soon as the shore supply cable has been plugged in...

Page 19: ...s have absolute priority In case of a lack of capacity all other consumers have to be switched off first By a stand by operation of the engine even when under sail the batteries can be brought up rath...

Page 20: ...ce and maintenance must be carried out by a qualified specialist Warning To avoid the danger of a rush of current or fire The shore connection cable must never hang into water Plug the shore connectio...

Page 21: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 21 2 5 6 Distribution of electric devices...

Page 22: ...atterie 55 Ah 1 Bord battery 140 Ah Bordstromkreis Batterie 140 Ah 1 o 2 16 Battery charger option Batterieladeger t Option 1 17 Electric panel Elektro Panel 1 18 Main switch Batterie Hauptschalter 1...

Page 23: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 23 2 5 7 Wiring plans...

Page 24: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 24 2 5 8 Distribution plans...

Page 25: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 25 2 5 9 AC distribution...

Page 26: ...replaced after the expiry date The reducing valve in the gas cylinder casing has a service pressure of 30 mb The flow rate is 1 kg h 2 6 1 The components 2 6 2 Operation Gas installations require care...

Page 27: ...ust gas pipes at least once a year Replace them if they a defective 2 7 Fire protection When building the yacht special attention was payed to avoid the risks of fire This includes the choice of mater...

Page 28: ...t the position and use of all fire extinguishers and the fire retarding cloth the position and function of the opening for the extinguisher s nozzle in the engine room bulkhead the exit through the es...

Page 29: ...eplaced if necessary A constant flow of sea water has to be guaranteed The hose is secured at its joints with two clips If there is an interruption of the sea water flow the temperature sensor in the...

Page 30: ...se nipples All hose connections are secured with two clips each For the cockpit drain special plastic joints are used Maintenance note The tightness of board ducts should be inspected regularly Check...

Page 31: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 31 Board ducts...

Page 32: ...t exhaust pipe of the diesel engine reduces the engine sound considerably Additionally rubber bearings elastic couplings and the engine room insulation minimise sound emissions Nevertheless you should...

Page 33: ...between the caulking material and the sides of the joint may break down allowing water to enter Paints and lacquers are decorative coatings which when applied to a teak deck dry to form a continuous f...

Page 34: ...ade out of the right material or the stainless steel has not been treated correct Before you will buy the fitting ask f e if the fitting has been polished electrical 4 2 Wearing and spare parts As an...

Page 35: ...tions of the manufacturer Slacken all belts lighting engine and other engine driven devices Winter storage Observe all notes in the engine manual Store the fully charged batteries at a ventilated fros...

Page 36: ...per to introduce his crew into their operation Those being prepared for an emergency are normally never involved But just in case the yacht is properly equipped for those situations with suitable mean...

Page 37: ...working instructions hand operated bilge pump compass bilge pump WC instruction elapsed time indicator Proof of identity to be completed by the dealer or party to the contract 1 First launch 2 Date of...

Page 38: ...Bavaria 32 Bavaria Yacht Bau GmbH 39 38...

Page 39: ...32 Bavaria Yacht Bau GmbH 39 39 Please return signed to address of the dealer Acknowledgement of receipt Name Address Owner of the yacht BAVARIA 32 HIN DE BAVU32Y0E303 Signature _____________________...

Reviews: