
3. Placing into Operation
3-1
Subject
Page
Connect to earth
3-2
Prepare test
3-2
Switch on
3-3
Switch off
3-4
EMERGENCY OFF
3-4
Change operating mode
3-5
3. Placing into Operation
Overview
In this section you will find all necessary information to put the High
Voltage Testing Sets PGK 70 HB, PGK 70 - 2,5 HB, PGK 110 HB,
PGK 150 HB and PGK 260 HB into operation.
This section contains the following subjects: