Operating sequence of installation
Instruction handbook BUM 60 / BUS 60
Document No.: 5.01032.05
Baumüller Nürnberg GmbH
48
7.8
7.8
Operating sequence of installation
DANGER!
Risk of fatal injury from electrical current!
Electrically live parts are life-threatening.
Therefore:
m
Make certain that the parts to be mounted (e.g. power supply cables) and the
mounting areas are de-energized for the entire duration of mounting the device.
h
Lay all cables EMC-compatible.
h
(refer to the permissible torque)
The following steps must be carried out at installation:
1
Connect the motor via the terminals 1U2, 1V2, 1W2, PE. Attend to the in-phase connection
(rotational direction).
(refer to the permissible torque)
2
Connect the device via the power input terminals 1U1, 1V1 and 1W1 to the power choke
output - not necessary for BUS 60.
3
Connect the protective conductor to the terminal PE (a permanent PE connection is required
imperatively).
4
Connect the 24 V supply
(in case you consider UL 508 C: limit the current to 4 A).
5
Connect the controller (see operation manual controller)