Petrol Powered Pole Tools
E&OE
©2019 Bäumr-AG
14
Before Use Checklist
Ensure that you carry out all procedures below before starting the engine or operating the
equipment. All procedures described are generic in nature and slight variations between different
models may exist.
Failure to follow the checklist and carry out the procedures correctly may result in
making the product warranty void
. • Wear suitable gloves when handling cutting devices.
Products with 4-stroke engines are NOT supplied with engine oil, although traces of oil from
the manufacturing process may be present. It is essential to add adequate engine oil of the
correct type to the engine before use – see
Failure to add engine oil will void the product
warranty
.
Basic Tool Assembly
Typically, the main pole tool requires minimal assembly, however, due to the modular nature of the design,
various attachments may require some assembly. Prior to assembly, unpack all components and check that
all items have been received. The following assembly instructions may not apply to all models as some are
pre-assembled or partially pre-assembled.
Drive Shaft, Handle, Throttle and Strap
1. Slide the drive shaft (
A
) through the throttle assembly (
B
). Be careful not to stretch or pull on the throttle
assembly wiring. Secure the throttle assembly in position using the screws and nuts (
C
) on either end of
the throttle.
2. Bring the driven end (
C
) of the drive shaft up to the motor, then slide it over the motor output clutch (
D
).
Secure the drive shaft to the motor using 4 M6 cap screws (
E
) – tighten the screws progressively and
from opposite corners to help ensure that drive shaft is mounted squarely against the engine.
3. Slide the swivel collar (
F
) onto the drive shaft, to a position where the strap will be effective and
comfortable to use. Tighten the swivel screw to secure it.
4. Slide the rubber vibration isolator (
G
) onto the drive shaft, to a position where the handle will be effective
and comfortable to use. Clamp the 2 handle components (
H
and
I
) over the rubber vibration isolator and
secure it using 4 screws and nuts (
J
).
5. Clip the strap (
K
) to the swivel collar.
B
A
B
C
D
E
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG
BAUMR-AG BAUMR-AG BAUMR-AG BAU
MR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG BAUMR-AG