
27
and
the terminals are accessible by removing the terminal block
o
The cable connections must be made in accordance with the
o
1, 2 and 3 are the live connection, 4 and 5 are the neutral
n.
MUST be placed in connection number 4.
Connecting the mains supply cable
o
The mains terminal block is located on the rear of the oven
cover. You should remove the cover screw to access this.
diagram below:-
connection and the remaining one is the earth connectio
o
The live wire MUST be placed in connection number 1.
The neutral wire
The earth wire MUST be placed in the connection marked with
the symbol.
o
The brass links must be positioned as marked in the diagram
above and once established ALL terminal screws must be
tightened down firmly.
Summary of Contents for PO900SS
Page 1: ...Ng c 1 PO900SS 60 cm Built in multifunction self cleaning pyrolytic double oven...
Page 34: ...34...
Page 35: ...35...
Page 36: ...36...