
Check-mark
Check these items:
Frequency
Check the three linch pins on the hitch to verify they are
securely fastened.
Each operation.
Verify the pins on each end of the drive shaft are secured.
Each operation.
Verify the safety chains on the drive shaft are securely
attached to the cover.
Each operation.
Verify the cutting tips on the rotor are tight.
Every 4 hours.
Check belt chamber.
Every 4 hours.
Check the oil in the brush mulcher’s gearbox. For type and
quantity refer to the maintenance section.
Every 200 hours.
4�3 Pre-Operation Check List
4�4 Machine Components
A. Operators Manual Storage Tube
B. 3-Point Top Link
C. 3-Point Lift Points
D. Gear Box
E. Cutting Teeth
F. Rotor
G. Cutting Shield Hydraulic Cylinder*
H. Debris Guard
I. Cutting Shield*
J. Brush Push Bar
* MP548 is not equipped with a hydraulic cutting
shield.
12