DPK
-M
A
N
-EN
-0000
-0
0
0
1
-18
-08
-13
M
o
te
u
rs
B
a
u
d
o
u
in
re
se
rve
th
e
ri
g
h
t
to
mo
d
ify
t
h
e
se
s
p
e
cificat
ion
s
,
wi
th
o
u
t
n
o
tice
.
Docu
m
e
n
t
n
o
t co
n
tra
ctu
a
l.
C2002 ELECTRONIC GOVERNOR
Date :
13-08-18
PowerKit Engine
Page :
5 / 15
Technoparc du Brégadan - 13260 Cassis / France
– Tel. +33 488 688 500
4.1.3 Connection diagram of the C2002 speed governor
Terminal
Wire harness
Less than 6 meters
More than 6 meters
Terminal 1 and 2 shall connect with the winding
end of the actuator
2.5 mm²
4 mm²
Terminal 3 and 4 shall connect with speed sensor
(the minimum signal of the both ends is 2,5 Vac)
1.0 mm²
2.5 mm²
Terminal 5 and 6 shall connect with battery (refer
to the voltage value of the governor)
2.5 mm²
4 mm²
Terminal 7 and 9 shall connect with Remote Speed
Potentiometer
The signal points are milliampere level current, so
1.0 mm² ~ 2,5 mm² wire harness can be used for
connection.
In
a
strong
magnetic
field
environment, You shall use the shield lines to for
connection and shielding net shall connect the
nearest grounded end of the governor effectively.
Terminal 7 and 12 shall connect with the idle / rated
speed switch
Terminal 10 and 11 shall connect with the drop
switch
Terminal 13 is the access terminal (which is the
access terminal of the synchronizer, load
distribution and ramp generator and so on, which
is used for the parallel operation and exceptional
setting)
Terminal 14 is the auxiliary power output for
+10Vdc; load should be less than 20mA
Document Courtesy of Fly Parts Guy Co.
www.FlyPartsGuy.com
Document Courtesy of Fly Parts Guy Co.
www.FlyPartsGuy.com