Addenda A: Summary of quick operating 

I.

 

Preparing   

1. Verify that the  machine  is plugged  in power or the battery capacity is 

enough; then press 

  and hold the key until the machine is booted. 

2. In the standby  mode, press 

  to enter “Splice Menu”  menu. Move 

the cursor to [Operation Options]; press 

  to enter. Set [Auto Start] 

[pause 1],[pause 2] respectively as “ON”,“OFF”,“OFF”. 

          3. 

Discharge Calibration

*   

    Discharge  calibration  is  needed  because  constant  changing  of 

atmospheric  conditions  such  as  temperature  and  pressure,  and  the 

long service of the  machine creates variability  in the arc  temperature 

and position.   

 

 

Step of discharge calibration

          In the [ Ready ] mode, press 

  to enter “Splice Menu” menu.   

Then  prepare  and  place  fiber  according  to  the  method  described  in 

fiber  preparation.  Close  the  wind  protector.  Press 

  to  enter  [Arc 

Calibration].  Discharge  calibration  automatically  starts.  The  user  is 

recommended  to  repeatedly  prepare  and  place  fiber  in  discharge 

calibration  interface,  until  the  “Step  II  of  discharge  calibration 

completed” message is displayed for three times. 

Note:

*

 

Discharge calibration is needed only arc power fluctuates strongly;   

it is not necessary upon boot every time. After discharge   

calibration is completed, the machine will adjust the arc discharge   

Summary of Contents for BD-FS-30

Page 1: ...f this model of machine is definite please do not use the voltage outside the scope Please use the correct AC and DC power supply 2 When the fusion splicer comes across the following failures please i...

Page 2: ...ake in maintenance will lead to the machine beyond repair even causing bodily harm 4 The machine has strictly limitation to the power supply module used 5 The fusion splicer is prohibited to be used u...

Page 3: ...4 2 3 Battery supply operation 5 2 4 Turn on and turn off 8 2 5 Display brightness control 9 2 6 Cover fiber protection sleeve 9 2 7 Preparation of fiber end face 10 2 8 Place fiber 11 3 Check and Ma...

Page 4: ...25mm 0 9mm fiber SC connector option Splicing Time 9s Heat Time 30s Cleaved Length 8 16mm Fiber Image Magnification 350 280 View Display 5 inch digital high quality LCD screen Tension Test Standard 2N...

Page 5: ...cn 1 Fusion Splicer 1 set 2 Carrying Case 1 set 3 AC Adaptor 1 pc 4 Power cord 1 pc 5 Cooling tray 1 pc 6 Spare Electrodes 1 pair 7 User Manual CD 1 pc 8 Test Report 1 pc 1 3 Parts Name of fusion spl...

Page 6: ...isplay The optical fiber moves downward Invalid Increase the parameter quantum or move the cursor Invalid The optical fiber moves left Invalid Increase the parameter quantum or move the cursor Turn on...

Page 7: ...le for field work Operation is simple fusion speed is high and fusion loss is small 2 1 Descriptions of the power modules The Fusion Splicer uses 2 in 1 power module design during the work the Fusion...

Page 8: ...rranged in the battery case the battery pack will also be charged when the adapter is supplying power However it is recommended that the Fusion Splicer be shut when charged 2 3 Battery supply operatio...

Page 9: ...arging indicator CHARGE light is red after the charging completion the charging indicator CHARGE will be green 3 When the splicer is shut down the maximum charging time is three hours 40 minutes and t...

Page 10: ...life belongs to consumables When the fusion splicer can only work for a short time despite the battery level of the lithium battery above 90 please replace the battery Please use the battery of the m...

Page 11: ...s stored for a long time it should be charged with the special charger provided by the Company once every 90 days The life of the battery may be extended if the battery is half fully charged in a long...

Page 12: ...he Fusion Splicer operation Display brightness control should be done in the standby operation interface 1 Press or in the standby operation interface to change the brightness of the display 2 Press t...

Page 13: ...l or wadding soft enough to wipe clean the fiber Wiping with a clean cotton cloth once and do not clean it with the same cloth for the second time Notes Please use the alcohol with purity more than 99...

Page 14: ...n fixed containers 2 7 6 Pinch and hold the fiber with the left hand and open the small clip with the right hand at the same time and carefully remove the fiber Notes The clean cross section of fiber...

Page 15: ...ce don t touch the V shape groove when place the fiber 2 8 4 Place another optical fiber according to the above steps 2 8 5 Close shielding cover 3 Check and Maintenance Critical cleaning points and m...

Page 16: ...r quality splices The fiber clamp chips should be frequently inspected and periodically cleaned during normal operation 2 To clean the clamp chips do the following Open the wind protector Clean the su...

Page 17: ...objective lenses always turn off the splicer Do not hit or touch tip of electrode when cleaning it 2 Gently clean the surface of lenses X axis and Y axis with an alcohol impregnated thin cotton swab...

Page 18: ...ning on the power Using the electrodes without a replacement will result in greater splice loss and reduced splice strength Replace Electrodes 1 Press button on the operator panel until the LED indica...

Page 19: ...ursor to select the Calendar 2 Press to enter Current Calendar interface Move the cursor to select the item to be changed Press to adjust the value 3 After completion of calendar setting press The dat...

Page 20: ...Aligning the card slot place new battery into the power module and make sure it is plugged in tightly then close the cover of the battery case which is at the bottom of the Fusion Splicer 5 Power Sup...

Page 21: ...onsumption The AC DC adapter is not the model supplied by the Company or the charging time is not long enough CHARGE LED on AC adapter blinks during battery recharge Atmospheric temperature is too hig...

Page 22: ...nd pressure and the long service of the machine creates variability in the arc temperature and position Step of discharge calibration In the Ready mode press to enter Splice Menu menu Then prepare and...

Page 23: ...finished fiber in the Fusion Splicer Cross section of fiber can not touch other things Cover the wind protector then the fiber fusion automatically starts and the splicing loss is displayed Reinforce...

Page 24: ...ies and accessories or other external factors such as voltage instability Unauthorized disassemble or repair Consumable parts such as electrode cleaver blade carrying case of fusion splicer etc Before...

Page 25: ...Website www baudcom com cn Tel 86 21 37709251 Email info baudcom com cn Addenda C Contact Notice This Company s products are ameliorated continually modification won t be informed...

Reviews: