Website: www.baudcom.com.cn Tel: +86 21 37709251 Email: [email protected]
Addenda A: Summary of quick operating
I.
Preparing
1. Verify that the machine is plugged in power or the battery capacity is
enough; then press
and hold the key until the machine is booted.
2. In the standby mode, press
to enter “Splice Menu” menu. Move
the cursor to [Operation Options]; press
to enter. Set [Auto Start]
[pause 1],[pause 2] respectively as “ON”,“OFF”,“OFF”.
3.
Discharge Calibration
*
Discharge calibration is needed because constant changing of
atmospheric conditions such as temperature and pressure, and the
long service of the machine creates variability in the arc temperature
and position.
Step of discharge calibration
:
In the [ Ready ] mode, press
to enter “Splice Menu” menu.
Then prepare and place fiber according to the method described in
fiber preparation. Close the wind protector. Press
to enter [Arc
Calibration]. Discharge calibration automatically starts. The user is
recommended to repeatedly prepare and place fiber in discharge
calibration interface, until the “Step II of discharge calibration
completed” message is displayed for three times.
Note:
*
Discharge calibration is needed only arc power fluctuates strongly;
it is not necessary upon boot every time. After discharge
calibration is completed, the machine will adjust the arc discharge