9
BATTERY REPLACEMENT
1. Remove the (4) corner screws attaching the flow meter electronics and
Bluetooth module to the meter and lift away from the meter.
2. Remove the
AAA
batteries from the display and then the
CR2477
3V lithium
cell battery from the Bluetooth module.
3. Check the battery terminals and remove any corrosion.
4. Install the new batteries, preferably starting with the
AAA
cell battery. For the
AAA
batteries, make sure the positive posts are positioned correctly. When
the batteries are installed correctly, the flow meter powers on automatically
and the display will show information.
5. Install the
CR2477
battery with the positive side up.
6. Make sure the seal is fully seated before placing the flow meter electronics
back on the turbine. Make sure wires aren't obstructing the seal. Tighten the
(4) screws previously removed.
7. Do not clean exterior of flow meter assembly with Isopropyl Alcohol, use a
damp cloth as needed.
NOTE: It is recommended to replace the batteries every year.
WARRANTY
This product is warranted against defects in workmanship and materials
for a period of one year from date of shipment.
Summary of Contents for Direct Fill Link+
Page 1: ...English 1 11 Direct Fill Link Direct Fill Link with Bluetooth Enabled Flow Meter...
Page 13: ...12...
Page 14: ...13...
Page 15: ...14...