![Bathology Spectrum 620-C Installation And Operation Manual Download Page 12](http://html1.mh-extra.com/html/bathology/spectrum-620-c/spectrum-620-c_installation-and-operation-manual_2708183012.webp)
12
S p e c t r u m 6 2 0 - C & 6 2 6 - C
Installation - Himalayan Salt Panel (Remote (Phase 1))
Installation - Himalayan Salt Panel (Remote (Phase 1))
1. Determine the desired locations
for the following: Power Supply
(G), RF Receiver (F), and Salt
Panel Assembly (A).
Note:
RF
Receiver (F) and Power Supply
(G) must be in an accessible,
dry location. Provided cord
lengths are 50’ maximum.
Note:
Himalayan Salt Panel Assembly
(A) can be recessed or surface
mounted.
2. Install electrical boxes for the
following: RF Receiver (F),
Power Supply (G), and Salt
Panel Assembly (A).
3. Run a 120VAC externally
switched GFCI outlet to power
electrical box supplying power
to Power Supply (G).
4. Route Light Extension Cable
(E) from RF Receiver (F) to Salt
Panel Assembly (A).
5. Connect the Light Extension
Cable (E) to RF Receiver (F).
6. Connect the RF Receiver (F)
to the main power cable from
Power Supply (G).
RF Receiver
F
W
W
4
+
-
O
U
T
P
U
T
+
IN
P
U
T
12
-
24
V
D
C
+
+
+
+
+
+
B
G
R
V+
V+
V -
Light Extension
Cable
Power Supply
E
G