background image

 

BASSRA MACHINE TOOLS LTD. 

99 Spring Road, Tyseley, Birmingham, United Kingdom, B11 3DJ 

Tel: 0044 (0) 121 707 4343 / Fax: 0044 (0) 121 707 3535 

Website: www. bassra.com / Email: [email protected]

 

 

 

6.  Safety Rules for Filling the Hotmelt Material 

 
The following rules must be taken into attention while filling the Hotmelt material. 
 

 

The level of the Hotmelt material should be checked every time before starting 
the machine.  If the machine is working non-stop, the operator should check 
the level of the material.  It should never drop below the tank tubes. 

 

 

Hotmelt material is taken out of its package in a solid state, and must be put 
inside the tank without touching any external material. 

 

 

The material in its solid state must be put slowly into the tank.  Material must 
not be thrown from a higher place otherwise this can damage the tubes. 

 

 

Eyeglasses and masks must be used while the tank is open.  Direct contact of 
hot air rising from the tank should be avoided. 

 

 

High temperature warning signs must be taken into consideration while 
working in the tank cap and its surroundings. 

 

 

Use the machine in a well ventilated area. 

 

 

Gloves must be worn while gunning to prevent burns. 

 

 

The material’s chemical composition, which is defined in the closure, has no 
toxic property.  Any kind of toxic material should not be used.  BMT strongly 
refuses liability in case of any hazards that could arise from misuse of the 
machine and material. 

 

 

The machine should be positioned on a level surface. 

 

 

Ensure that in between operations, the gun is placed in a safe place to ensure 
that nobody touches the hot parts. 

 

Summary of Contents for BMT 1000

Page 1: ...HINE TOOLS LTD 99 Spring Road Tyseley Birmingham United Kingdom B11 3DJ Tel 0044 0 121 707 4343 Fax 0044 0 121 707 3535 Website www bassra com Email sales bassra com USER MANUAL BMT 2000 HOTMELT BUTYL...

Page 2: ...f all Temperature Zones Tamper Proof Factory set Operating Temperatures Programmable Temperature Controllers Progressive Sealant Heating Hopper Pump Hose Gun Cool to Touch Moulded Gun Handle 3 Metre H...

Page 3: ...bout the Machine 4 2 Introduction 5 Operation Manual Questions Training 3 Signatures 6 4 Intended Use of the Machine 7 5 General Safety Rules 8 10 General Rules Electrical System 10 6 Safety Rules for...

Page 4: ...l Type 2000 Serial Number _________________ Date of Construction _______________ Warranty Start Date _______________ Warranty Finish Date _______________ Voltage Frequency _______________ Motor 0 55 K...

Page 5: ...ch operator must read this manual BEFORE operating the machine Make sure the manual is kept near the machine and is always at hand for the operating personnel Questions Should you have any questions o...

Page 6: ...on responsible for plant safety should request all operators to confirm this by asking them to sign below I have read and understood this Operating Manual Date Signature Owner ______________ _________...

Page 7: ...f properly operated Safety has been a major design consideration However any machine can be a source of potential danger if improperly handled or operated by unqualified untrained and careless personn...

Page 8: ...he sole responsibility for any resulting injuries or damage Make sure the enclosures removed for maintenance work or repairs are refitted before starting the machine Do not begin any maintenance or se...

Page 9: ...parate the machine from the power supply Master Switch OFF and secure it against accidental restart before starting any work on any electrical components Only qualified electricians are allowed to do...

Page 10: ...n its solid state must be put slowly into the tank Material must not be thrown from a higher place otherwise this can damage the tubes Eyeglasses and masks must be used while the tank is open Direct c...

Page 11: ...Pump Hose Gun Temperature Control will read the temperatures of their respective zones A BMT 2000 will take approximately 2 hours Refer to table on Page 17 to 19 to reach 185 190 C depending on ambie...

Page 12: ...ature Controllers Machine is not Plug the machine into a do not light up plugged in 220V 240V mains supply Check fuse if fitted in Plug top Isolator is not Switch on Isolator switched on Check timer s...

Page 13: ...tinues please telephone the BMT Technical Department Problem Cause Remedy No Hotmelt is extruded Speed Control is on Turn the knob when trigger is pulled minimum or OFF clockwise to desired speed Temp...

Page 14: ...BASSRA MACHINE TOOLS LTD 99 Spring Road Tyseley Birmingham United Kingdom B11 3DJ Tel 0044 0 121 707 4343 Fax 0044 0 121 707 3535 Website www bassra com Email sales bassra com 11 Warning Symbols...

Page 15: ...BASSRA MACHINE TOOLS LTD 99 Spring Road Tyseley Birmingham United Kingdom B11 3DJ Tel 0044 0 121 707 4343 Fax 0044 0 121 707 3535 Website www bassra com Email sales bassra com 12 Notes...

Page 16: ...ealing the units the machine should be run back into the hopper for a few seconds to ensure no cold sealant is injected into the unit Non compliance will result in the guarantee being void Refer to th...

Page 17: ...n release it and the display will visualise SP1 To modify the valve press UP key to increase it or the DOWN key to decrease it Once the desired valve has been reached by pushing P it is possible to ch...

Reviews: