4-1
SECTION 4
INSTALLATION & OPERATION
4-1. INSTALLATION
4-2. INTERCONNECTION
2.6 (65)
2.9 (73)
0.5
(13)
8.5
(216)
6 - 3 2 T E R M I N A L
S C R E W O N
0 . 3 7 5 C E N T E R S
TYP. 32 PLCS.
4.5 (114)
6.5 (165)
1.0 (25)
0.218 (6) DIA.
M O U N T I N G
4 P L A C E S
9.0
(229)
9.5
(241)
N O T E : A L L D I M E N S I O N S A R E I N I N C H E S ( M I L L I M E T E R S ) .
The unit is convection cooled and should not be mounted near heat generating equipment or
inside of totally enclosed switchgear where the temperature rise could exceed the Synchronizer's
operating limit. Vertical mounting is recommended to obtain optimum convection cooling. Refer
to Figure 4-1 for dimensions and mounting holes.
Figure 4-1. BE3-25A Outline Drawing.
a. Power and Sensing Connections. Connect the power and sensing inputs to the BE3-25A as
shown by Figures 4-2 through 4-5.