base engineering MEC EXCELA-WYND ME9000LH-17 Installation And Operating Instructions Manual Download Page 2

 

 

ME9000LH-17/25 EXCELA-WYND

 HOSE REEL (Patent Pending) 

INSTALLATION AND OPERATING INSTRUCTIONS

 

 

 

 

Form #1176, Excela-Wynd™ Hose Reel IOM 

Page | 2 

Rev B

 12/1/21 

 

INSTALLING REEL 

 

Unboxing

 - See 1176-UB unboxing instructions located on the shipping box or see “Unboxing” section in the Appendix.   

 

Locating Reel on Deck - 

MEC recommends using the ME9000LH-17/25-DJ Drill and Piping Jig to properly position the reel on the 

           deck and allow piping to be fabricated prior to mounting the reel. 

 

49 CFR Section 178.345-8

 

Accident Damage Protection

 requires that a

ny part of the cargo tank motor vehicle which 

contains lading during transit must be at least 6 inches horizontally forward of the vertical plane of the outboard surface of 

the protection device (bumper). 

 

To assure compliance and proper operation

, the ME9000LH-17/25 Excela-Wynd hose reel must be positioned on the deck 

and installed according to these instructions.  

Installation inconsistent with these instructions may cause damage to the 

hose or hose reel and may void warranty. 

 

 

     

 

 

 

  

 

 

Summary of Contents for MEC EXCELA-WYND ME9000LH-17

Page 1: ...ose on the ME9000LH 17 25 Excela Wynd hose reel 8 Installation or service inconsistent with these instructions may damage the reel increase the risk of injury or void the warranty BEFORE SERVICING THE...

Page 2: ...and allow piping to be fabricated prior to mounting the reel 49 CFR Section 178 345 8 Accident Damage Protection requires that any part of the cargo tank motor vehicle which contains lading during tra...

Page 3: ...impact driver to tighten mounting bolts Use 4 SS carriage bolts 4 SS backing plates 4 SS flat washers and 4 SS locknuts from the HARDWARE KIT and 2 Dielectric Mounts from the ACCESSORIES BOX Install...

Page 4: ...ils Sensor Use the MEP801PC 30 extension cable from the ACCESSORIES BOX to connect the sensor to the VSC9000 controller terminal block according to the instructions and diagrams provided by BASE Engin...

Page 5: ...d Hose reel in speed can be set to one of eight linear hose speeds ranging from 1 5 to 3 5 MPH Company policy seasonal conditions or driver preference may dictate the required speed The controller is...

Page 6: ...lign riser with curvature of hose as shown Installing Hose in Gimbal Hose Guide Using 3 4 wrenches remove the nut bolt and washers holding the gimbal roller remove the roller assembly and set aside Re...

Page 7: ...lots over the mounting bolts and move it down until the bolt heads clear the flange 3 Move it fully forward until outlet and offset riser flanges are aligned 4 Push offset riser down to engage alignme...

Page 8: ...inlet flange riser flange riser hose connection and hose end valve hose connection For improved level wind performance remove twist due to coiling and storage from hose before loading Use REEL IN to...

Page 9: ...Tempered stainless steel Mounting Hardware Stainless steel Backing Plates Stainless steel Gear Guard Welded polished stainless steel Level Wind Cover Welded polished stainless steel Spool Reel Ends Ha...

Page 10: ...air replacement part or replacement device for the remainder of the original warranty period or for ninety 90 days whichever period is longer All replaced parts and products for which a refund is give...

Page 11: ...ur products and incorporating engineering advances to ensure our products perform and comply with changes in market conditions government mandates and code changes Marshall Excelsior shall not be requ...

Page 12: ...LIFT BOX OFF PALLET 3 USE A 3 4 WRENCH TO REMOVE SHIPPING HARDWARE 4 REMOVE AND RETAIN ACCESSORIES BOX 5 KEEP ACCESSORIES BOX WITH REEL ACCESSORIES BOX CONTENTS ACCESSORIES BOX OPERATORS MANUAL INSTAL...

Page 13: ...ME9000LH 17 25 EXCELA WYND HOSE REEL Patent Pending INSTALLATION AND OPERATING INSTRUCTIONS Form 1176 Excela Wynd Hose Reel IOM Page 13 Rev B 12 1 21 VSC9000 Controller Configuration Diagram...

Page 14: ...eel release the latch and rotate the Gimbal until it locks in place 2 Press and release the REEL OUT button on the PC3 or ASKW and keep remote with you NOTE Reel brake is released and motor turns brie...

Page 15: ...sert the safety collar into the axle 2 Push in and turn to engage drive pin When the hose is loaded remove crank replace safety cap and place in storage pouch Note Turning the truck ignition off relea...

Reviews: