4
Do
not place directly on vapor barrier. For example, use blocks, or pavers to create a level surface.
NOTE: AirWerx 55 Dehumidifiers can't sit directly on the floor unless the unit is feeding directly into a
sump pump next to it. Elevation is required to allow gravity flow of condensate water drain.
If the unit is handled in such a manner that the compressor did not remain in the upright position, it is
necessary to place on a level surface and wait a minimum of 2 hours before turning the unit "on".
Step
#
1
:
Place
dehumidifier
on
a
level
surface
.
The
drain
line
should
be
routed
to
a
suitable
drain
on
the
outside.
It
must
flow
down
to
a
drain
without
any
loops,
dips,
or
valleys.
Step #2: Set Up Drain Line
(
Note:
Keep
the
length
of
PVC
drain
pipe
to
a
minimum
)
.
5
.
Always
test
the
drain
before
leaving
the
installation
area
.
4.
Support
the
PVC
tubing
so
that
it
maintains
a
smooth
downward
flow
to
drain.
2.
Insert
PVC
into
a
3
/
4
"
elbow,
then
attach
to
a
3
/
4
"
OD
length
of
PVC
to
drain.
3.
Insert
the
open
end
of
the
tubing
into
the
3
/
4
"
pipe
so
that
it
does
not
extend
into
the
elbow
fitting.
For
proper
flow,
a
minimum
downward
slope
of
1
"
per
10'
runs
is
required.
(
Note:
If
a
proper
downward
angle
is
not
possible,
then
it
is
recommended
to
use
an
AirWerx
90X
which
includes
an
integrated
pump.
Alternatively
,
you
can
use
an
external
condensate
pump
)
.
1.
Cut
a
piece
of
3
/
4
"
OD
PVC
that
is
approx.
6
"
long.
Recommended
Drain
Option
-
Transition
to
PVC
Pipe
Drain Tube - 12 inches Long. 19mm OD.
Summary of Contents for AirWerx 55
Page 2: ......