PAGE - 8 -
3. Installation
•
After preparation for mounting, the device is to be placed in the designated room in accor-
dance with the system structure.
•
All inlets and outlets are connected on the water’s side. The device connections are
shown in the following figure.
•
The brine tank of the water softening device is filled with salt tablets (max. filling 100 mm
from the upper edge of the brine tank). Next add 10 litres of water using buckets.
•
Check and tighten all fittings connecting the device.
•
Connect to electric power.
4. Start-up
By the technical support personnel
•
The device is factory adjusted. The fine tuning is done by technical support personnel on
site.
•
The utility water valve to the device can be removed after installation. The water pressure
must be at least 2 bars and a maximum of 6 bars.
•
Once all connections are made the system can be connected to the electric power.
•
The device will start and produce the first soft water.
Drainage
(sewer)
Branch pipe, soft
water
Supply pipe,
utility water
Injector’s tube
connector
Control head
Power
cable
Control system (optional)