2. Installation preparation plan
2.1 Installation preparation plan
2.2
Dismantling and utilization
The device is dismantled after it lifetime has expired (for final destruction or scrap). The re-
versed assembly steps are to be commenced.
Note!
First clean the system thoroughly with fresh water and drain the tanks and pipes completely!
Comply with workplace safety instructions in this respect!
•
Different parts of the device must be utilized in accordance with binding regulations of
utilization and waste management!
Installation preparation plan
for the purchaser
Project:
The set includes:
manifold (optional)
connections set (optional)
water softening device
(dimensions: width = 310 mm, depth = 520 mm,
height = 655 mm)
3
5
500 mm
650 mm
Device
MC-N
16
2
1
100
4
On the purchaser’s side:
①
Utility water supply pipe (cold) 3/4” with a cut-
off valve at a height of 500 mm.
②
Soft water branch to the user in DN 20, 3/4” with
a cut-off valve at a height of 500 mm.
(pipe line made of material resistant to treated
water such as PE, PP and V
2
A).
③
Drainage (sewer) at a max. height of 100 mm,
connection DN 50.
④
Electric socket 230 V / 50 Hz, 16 A at a height
of 650 mm (from the top of the floor, centre).
⑤
Floor drainage must be in the room.