![Bartscher 105829 Manual Download Page 15](http://html1.mh-extra.com/html/bartscher/105829/105829_manual_3054505015.webp)
Installation and operation
105829
13 / 20
EN
Built-in Installation
The appliance and the control panel are designed to be installed in a work table
board. During installation, follow these indications:
1. For installation, select a work table board that is heat resistant to avoid
deformation due to the heat radiation of the appliance.
2. Make sure that the thickness of the work table board complies with the load
requirements (at least 30 mm).
3. Cut the opening in the work table board according to the diagram below.
3. Schneiden Sie eine Öffnung in die Arbeitstischplatte nach den Angaben in der
Zeichnung unten.
Abb. 2
4. Provide sufficient ventilation around the appliance and make sure that the
ventilation openings are not obstructed.
NOTE!
A safe clearance between the heating area and a cupboard above the
appliance should be at least 760 mm if no extractor hood is provided for.
Summary of Contents for 105829
Page 1: ...IK 35 EB 105829...