BARTINGTON INSTRUMENTS
Page 9 of 21 OM3224/4
7. Powering Sequence
Before powering the system, you should ensure that all the connections between the Helmholtz
Coil and the PA1, the PA1 and the CU1 and/or CU2 as well as the CU1 to a suitable National
Instruments acquisition card (or PXI-system) are done.
Once all connections are done, the following sequence should be used:
• Power the PC and National Instruments acquisition card or PXI system
• If using a CU2, ensure that the CU2 Reference Magnetometer is connected to the CU2 Module
• Power the CU1
• Power the PA1
To power down the system, the reverse sequence should be followed.
Please note that the equipment should be left to warm up for at least 12 hours before any of the
calibration is undertaken.
8. Troubleshooting, Care and Maintenance
In the event of any apparent malfunction, please email
service
@
bartington.com
, or telephone
the Bartington Instruments service team on +44 (0)1993 706565.
Note:
Fault finding by customers may invalidate the warranty.
9. Storage and Transport
The CU1 Control Unit should be handled with care.
Bartington Instruments has supplied this product in appropriate packaging for transporting it
safely. This packaging should be used for any future transport.
Refer to datasheet DS2613 for this product’s maximum environmental, electrical and mechanical
ratings.
Caution:
Exceeding the maximum environmental ratings may cause irreparable damage to
the equipment.