
Installation
Ex p Control unit
APEX
px
Page 26 of 96
01-37A2-7D0001_px_Manual_Exp-Control-Unit_20210923_0_en.docx
Rev. 0
Assembly "Internal mounting kit, type 05-0091-0275"
Mounting the atmosphere measuring point when mounting the Ex p control unit
inside the protected equipment
Procedure:
Make a 16.5mm diameter bore hole at the intended location on the
pressurized enclosure.
Screw the bleed screw (1) together with the sleeve (2) in the bore hole.
Screw the reduction (3) into the sleeve (2).
Screw the hose connection (4) into the reduction (3).
Push in the hose (5) into the hose connection (4) and lead it to the
internally installed Ex p control unit.
Replace the atmospheric measuring point by hose connection (4) and
insert hose.
Schematic diagram: