Installation, Continued
4. Remove the desired knockouts on the back of the enclosure
and mount to the J-box using the hardware supplied with the
J-box.
5. Make electrical connections. All electrical connections should
be made inside the J-box. Make electrical connection as
follows: (Fig. 6)
120VAC
277VAC
White - Common
White - Common
Black - 120VAC
Orange - 277VAC
Green - Ground
Green - Ground
Note:
Cap unused leads to prevent shorting.
6. Flip the cover up and re-secure using (2) 6-32 X 1/4“
screws.
7. Open the battery cover by turning the thumb screw
counterclockwise.
8. Connect the battery, as shown, then secure the
connector at the bottom left corner of the battery
compartment (Fig. 7).
9. Close the door and secure with the thumb screw.
Standard Operation Instructions
1. Energize un-switched AC power to the fixture.
2. Verify the indicator LED or numeric display is illuminated.
3. Press the test button and verify the lamps turn on.
Note:
If the lamps do not illuminate, allow the fixture to charge for 30 min.
4. Leave AC connected for the rated charge time prior to performing any full-length test.
5. Refer to the
Self-Test/Self-Diagnostics (G2)
section for operation.
White
(Neutral)
Black
(for 120V)
Orange
(for 277V)
Green
(Ground)
Fig. 6
Battery Connection
Knurled Thumb
Screw
Battery
Fig. 7
10070159
R
EV 8 - 08/22
3
800-533-3948 www.barronltg.com
SCL Series
Installation Instructions