Surface Ceiling, Surface Wall, or Flag Mount (Fig. 5-7)
1. Extend unswitched 24 hour AC supply of rated voltage to J-box
(provided by others). Leave at least 18 inches of slack. Circuit should
not be energized at this time.
2. Use a screwdriver to open the front cover, then connect the battery to
the PCBA(-WB).
3. Insert the bushing into the wire access hole to prevent abrasion on the
supply wires. Bring wires through the back of the fixture.
4. Make electrical connections; see
Electrical Connections
section.
5. Mount to the J-box.
6. Energize the AC supply; the LED indicator will come on.
7. Assemble the EXIT panel to the enclosure using screws. If the EXIT
panel is single face, be sure the EXIT lettering is facing the right
direction.
8. Replace the front cover to finish installation.
Fig. 7 - Flag Mount
Fig. 5 - Surface Ceiling Mount
10070267
REV 1 - 08/22
3
800-533-3948 www.barronltg.com
CH900X Series
Installation Instructions
Fig. 6 - Surface Wall Mount
9. Peel off protective film from both sides of EXIT panel ( Fig.6 ).