5
5.
6.
7.
Install Support Brace:
a. One support brace is included with 6'
railing kits.
b. Two support braces are included with 8'
railing kits.
Install support braces evenly across span of
railing section (Fig. 11).
Rails to Posts:
a. Bring assembled rails between posts, elevated
above brackets assembled in Step 2.
b. Once centered, slowly lower rail assembly
carefully to allow full engagement between
section and brackets in all four locations on
posts (Fig. 12).
NOTE:
The top rail profi le should rest on the
bottom of the bracket that is screwed
into post.
c. Attach brackets to rails – Pre-drill two holes
from under the bottom of the top rail through
rail. Complete for each top rail bracket. Drive
#8 x 1
1
⁄
11 2
⁄⁄ " Pan Head screws (2 per bracket)
through drilled holes.
Install pyramid post top onto each post (Fig. 13).
NOTE:
A rubber mallet may be needed for a
proper fi t.
Fig. 11
Fig. 12
Fig. 13
Pyramid Top
Post
33
3
⁄
33
4
⁄⁄ "
Support
Brace
33
3
⁄
33
4
⁄⁄ "