Step 5  

Once screws are secured in both 
posts, slide decorative screen 
panel in-between posts in 
grooves from top until it rests in 
the bottom U-Channel.  
 
Tip: Be sure panels are all facing 
the desired direction before 
assembling.  

Step 4 continued 

Using the 1/8” drill bit provided, pre

-drill pilot hole as 

indicated above. 

Screw should be installed directly on the small groove of the 
post and channels.

 

Using the #2 square drive bit provided in surface mount kit, 
secure screw into both posts securing posts and rail together.  

Remove 3” spacer blocks.

 

Step 6  

Slide H-Channel in the groove 
from the top, resting it on the top 
of the Decorative Screen Panel. 
Lift H-Channel up 1/8" (to allow 
for expansion and contraction), 
then pre-drill a hole following 
same process in step 4. Screw 
should be installed directly on the 
small groove of the post, 
connecting with the H-Channel. 

Step 7 

Repeat steps 5 & 6 for top panel. Note: Always use a tape 
measure to verify rails are at equal space from each other and 
that they are level. 

Step 8 

Place post cap on top of post (lining 
up the tabs underneath to the holes 
in the post). Using a rubber mallet, 
fully seat the cap onto the post.  

Step 9 

Assemble trim ring over plate. Take 
one side of trim ring and push plugs 
through holes underneath.  
Take second half of the trim ring and 
push together.

 

Slide over plate for a 

finished look.

 

 

Step 4  

Locate where to pre-drill 
a hole through post and 
rail as shown below. 
Pilot holes for screws 
should be located 
directly on the 
intersection of small 
groove of the post and 
channel. Be sure not to 
drill all the way through 
the back side of the post.

  

Summary of Contents for 73045674

Page 1: ... a complete set but only an extension In order to have a complete structure you must first buy the 3x6 panels Frame kit 73045672 Then you can add the desired number of extension kits Tools Needed Drill Pencil Tape Measure Rubber Mallet 3 Spacer Blocks 1 8 Metal Drill Bit Step 1 Install base plates to bottom of posts Locate bottom post with pre tapped holes and attach the bottom plate to that end U...

Page 2: ...raction then pre drill a hole following same process in step 4 Screw should be installed directly on the small groove of the post connecting with the H Channel Step 7 Repeat steps 5 6 for top panel Note Always use a tape measure to verify rails are at equal space from each other and that they are level Step 8 Place post cap on top of post lining up the tabs underneath to the holes in the post Usin...

Page 3: ...s clôtures de piscine AVIS NE PAS assembler le produit s il y a des pièces manquantes ou endommagées Étape 2 Placer les deux blocs d espacement de 3 po afin de supporter la traverse inférieure Prendre la traverse inférieure la glisser dans la rainure du premier poteau et la déposer sur les blocs d espacements Remarque cette étape sert à définir la distance entre les poteaux L ensemble contient 1 P...

Page 4: ...s pré percer un trou en suivant le même procédé qu à l étape 4 La vis doit être installée directement sur la petite rainure du poteau en raccord avec la moulure en H Étape 9 Assembler l anneau décoratif sur la plaque Prendre un côté de l anneau et enfoncer les bouchons dans les trous situés en dessous Prendre la deuxième moitié de l anneau et pousser ensemble Glisser sur la plaque pour une apparen...