Step 5
Once screws are secured in both
posts, slide decorative screen
panel in-between posts in
grooves from top until it rests in
the bottom U-Channel.
Tip: Be sure panels are all facing
the desired direction before
assembling.
Step 4 continued
Using the 1/8” drill bit provided, pre
-drill pilot hole as
indicated above.
Screw should be installed directly on the small groove of the
post and channels.
Using the #2 square drive bit provided in surface mount kit,
secure screw into both posts securing posts and rail together.
Remove 3” spacer blocks.
Step 6
Slide H-Channel in the groove
from the top, resting it on the top
of the Decorative Screen Panel.
Lift H-Channel up 1/8" (to allow
for expansion and contraction),
then pre-drill a hole following
same process in step 4. Screw
should be installed directly on the
small groove of the post,
connecting with the H-Channel.
Step 7
Repeat steps 5 & 6 for top panel. Note: Always use a tape
measure to verify rails are at equal space from each other and
that they are level.
Step 8
Place post cap on top of post (lining
up the tabs underneath to the holes
in the post). Using a rubber mallet,
fully seat the cap onto the post.
Step 9
Assemble trim ring over plate. Take
one side of trim ring and push plugs
through holes underneath.
Take second half of the trim ring and
push together.
Slide over plate for a
finished look.
Step 4
Locate where to pre-drill
a hole through post and
rail as shown below.
Pilot holes for screws
should be located
directly on the
intersection of small
groove of the post and
channel. Be sure not to
drill all the way through
the back side of the post.