Step 4
Place two 3" spacer blocks to support bottom rail. Take bottom
rail and insert into channel or first post, resting on the 3" spacer
blocks. Note: This step is to set distance in between posts.
Step 5
Take second post and insert opposite side of bottom rail into
the channel of this post. Be sure rail is fully inserted into the
post. Lock second post into position by repeating step #3.
Note: If connecting more than one frame kit together, line or
corner posts are available (sold separately).
Step 7
Once screws are secure in both
posts, slide decorative screen
panel in‐between posts in
grooves from top until it rests in
the bottom U‐Channel.
Step 6 continued
Using the 1/8” drill bit provided, pre‐drill pilot hole as
indicated above.
Screw should be installed directly on the small groove of
the post and channels.
Using the #2 square drive bit provided in surface mount kit,
secure screw into both posts securing posts and rails
together. Remove 3” spacer blocks.
Step 8
Slide H‐Channel in the groove from the top, resting it on the
top of the Decorative Screen Panel. Lift H‐Channel up 1/8" (to
allow for expansion and contraction), then pre‐drill a hole
following same process in step 6. Screw should be installed
directly on the small groove of the post, connecting with the H‐
Channel.
Step 9
Repeat steps 7 & 8 for top panel. Note: Always use a tape
measure to verify rails are equal space from each other and
that they are level.
Step 10
Place post caps on top of posts (lining
up the tabs underneath to the holes
in the post). Using a rubber mallet,
fully seat the cap onto the post.
Step 11
Assemble trim ring over plate. Take
one side of trim ring and push plugs
through holes underneath.
Take second half of the trim ring and
push together.
Slide over plate for a
finished look.
Step 6
Locate where to pre‐drill
a hole through post and
rail as shown below.
Pilot holes for screws
should be located
directly on the
intersection of small
groove of the post and
channels. Be sure not to
drill all the way through
the back side of the post.
MUST
pre‐drill through this surface.
Line Post Shown.
Be sure not to
drill all the way through the back
side of post.
You
MUST
pre‐drill through the front of
post, both sides of rail, and
back
wall of
post channel as shown. Failure to do so
will cause problems during installation.