![Barreto 825TKL Operator'S Manual Download Page 24](http://html1.mh-extra.com/html/barreto/825tkl/825tkl_operators-manual_3921979024.webp)
825TKL OPERATOR’S MANUAL 2/10/20
Page 24 of 28
UNLOADING PROCEDURE
1.
Position the tow vehicle and attached trailer on level ground.
2.
Remove all chains or straps connecting the 825TKL to the trailer D-rings
3.
Start the engine using the ENGINE START UP PROCEDURE.
4.
Keep the bucket or attachment low to the ground to prevent the unit from tipping forward while
unloading
5.
Drive the 825TKL slowly down the trailer or trailer ramps. Continue backward until tracks are
completely on the ground.
Summary of Contents for 825TKL
Page 2: ...825TKL OPERATOR S MANUAL 2 10 20 Page 2 of 28 UNIT OVERVIEW SPECS DIMENSIONS...
Page 3: ...825TKL OPERATOR S MANUAL 2 10 20 Page 3 of 28 825TKL ORIENTATION...
Page 4: ...825TKL OPERATOR S MANUAL 2 10 20 Page 4 of 28 KEY COMPONENTS GREASE POINTS...
Page 5: ...825TKL OPERATOR S MANUAL 2 10 20 Page 5 of 28 HYDRAULIC SCHEMATIC...