background image

825TKL OPERATOR’S MANUAL                2/10/20 

                           Page 23 of 28 

             

ROAD TRANSPORT OF THE 825TKL 

 

The 825TKL must be transported on a trailer with a minimum weight rating of 3500lbs 

 

Refer to the following checklist before towing: 

 

Towing vehicle should have the correct size ball. Be sure it is in good repair and securely 
fastened to the vehicle. 

 

Securely fasten the hitch to the ball by tightening the hitch nut. 

 

Thread the safety chain through the loop in the hitch nut handle to prevent it from vibrating loose 
while towing. 

 

Attach the safety chain to the towing vehicle in such a way that it cannot come off accidentally. 

 

Check the hitch-to-ball connection after driving a few blocks and re-tighten if necessary. 

Always exercise extreme caution and allow extra clearance while towing a trailer. 

DRIVE SAFELY! 

 

 

 
LOADING PROCEDURE: 

1.

 

Trailer and vehicle should be located on level ground before loading the 825TKL 

2.

 

If the trailer ramp angle is greater than 10°, the 825TKL should be loaded in reverse to allow 
the bucket or attachment to prevent the unit from tipping forward. 

3.

 

Drive the machine onto the trailer and position the machine to provide adequate tongue 
weight on the towing vehicle (tongue weight should be 10-20% of total towing weight).  

4.

 

Raise lift arms to allow access to the tie down point at the front of the 825TKL body, between 
the tracks.  

5.

 

Loop a chain through the front tie down point and secure chain with a quick-link or chain 
binder.  

6.

 

Loop a second chain through 

both

 rear tie down points and secure with a chain binder.  

7.

 

Lower the lift arms down onto the chain securing the front of the unit and apply a small 
amount of downward pressure on the chain.  

8.

 

Shut down machine following the shut down procedure.   

 

Summary of Contents for 825TKL

Page 1: ...LIC SCHEMATIC 5 SAFETY MESSAGES____________ 4 BATTERY ELECTRIC STARTER SAFETY INSTRUCTIONS 9 MACHINE OPERATING INSTRUCTIONS 10 CONTROLS 10 ENGINE START UP PROCEDURE 11 SHUT DOWN PROCEDURE 11 DRIVING P...

Page 2: ...825TKL OPERATOR S MANUAL 2 10 20 Page 2 of 28 UNIT OVERVIEW SPECS DIMENSIONS...

Page 3: ...825TKL OPERATOR S MANUAL 2 10 20 Page 3 of 28 825TKL ORIENTATION...

Page 4: ...825TKL OPERATOR S MANUAL 2 10 20 Page 4 of 28 KEY COMPONENTS GREASE POINTS...

Page 5: ...825TKL OPERATOR S MANUAL 2 10 20 Page 5 of 28 HYDRAULIC SCHEMATIC...

Page 6: ...NG or CAUTION is used with the safety alert symbol DANGER Imminent hazards that if not avoided will result in serious personal injury or death WARNING Potential hazards or unsafe practices that if not...

Page 7: ...DANGER Track Loader attachments and other moving parts can cut off arms legs or fingers Contact with attachments while in operation will cause serious injury or even death Wear safety goggles and a h...

Page 8: ...parking brake located behind the left hand track motor Move the handle down to engage the brake Do not leave 825TKL unattended with the engine running Do not operate the 825TKL near any source of flam...

Page 9: ...in place if the battery has removable caps WARNING The battery contains sulfuric acid that can cause blindness and severe burns Avoid contact with eyes skin and clothing If acid contacts eyes call 91...

Page 10: ...NSTRUCTIONS BEFORE OPERATING Both the SAFETY INSTRUCTIONS and OPERATING INSTRUCTIONS are in this manual Be sure that the engine oil and fuel and the machine hydraulic fluid are all at proper levels be...

Page 11: ...s will warm if necessary 4 Turn key to START position to engage starter Engine should fire within a few seconds Do not run the starter more than 20 seconds at a time This may damage the starter motor...

Page 12: ...engine speed allowing 30 minutes for the hydraulic fluid to warm up Reduce the engine speed if the hydraulic pump whines Pump noise may indicate a lack of hydraulic fluid flow that could damage the pu...

Page 13: ...ety of industry standard attachments from multiple manufacturers The attachment system consists of a mount plate connected to the lift arms at the front of the machine This plate also contains two loc...

Page 14: ...age 14 of 28 tilt the attachment plate upward to until the plate fully rests against the tool Lock the two lock pins in place using the levers attached to the lock pins Once the attachment is fully se...

Page 15: ...ows important information or warnings regarding the machine and engine operation The display panel also contains several buttons that will need to be used for the auxiliary tools to be enabled Normal...

Page 16: ...utton on the display then press the button again to cycle through the speed drive options TIP OVER PROTECTION In the event of a Tip Over situation the machine s incline sensor will shut off the fuel p...

Page 17: ...ttachments with Grapples or smaller secondary cylinders will use the Low Flow Auxiliary quick connect fittings To enable press the LF Tool button on the left side of the display panel This will allow...

Page 18: ...s will have a hydraulic motor These attachments will need to be attached to the High Flow auxiliary quick connect fittings on the right side of the lift arms To enable TOOL 1 press the HF Tool button...

Page 19: ...components WARNING Battery posts terminals and related accessories contain lead and lead compounds chemicals known to cause cancer and reproductive harm Acid can cause blindness and severe burns if le...

Page 20: ...mp one BLACK cable end to the booster battery NEGATIVE terminal d Clamp the other end of the BLACK cable to the frame of machine with the discharged battery away from battery 3 Start the engine 4 Disc...

Page 21: ...hand track motor Move the handle down to engage the brake WARNING Navigating on any slope increases the danger of the trencher losing traction or rolling over especially if the surface is wet Stay ou...

Page 22: ...825TKL OPERATOR S MANUAL 2 10 20 Page 22 of 28 DETAILED BYPASS LOCATION Engine rotated sideways to better illustrate location...

Page 23: ...while towing a trailer DRIVE SAFELY LOADING PROCEDURE 1 Trailer and vehicle should be located on level ground before loading the 825TKL 2 If the trailer ramp angle is greater than 10 the 825TKL should...

Page 24: ...chains or straps connecting the 825TKL to the trailer D rings 3 Start the engine using the ENGINE START UP PROCEDURE 4 Keep the bucket or attachment low to the ground to prevent the unit from tipping...

Page 25: ...Y AND OPERATING INSTRUCTIONS in this manual PERSONAL PROTECTION For safety trencher operator should wear personal protection equipment Keep observers at a safe distance Wear safety eye goggles and a h...

Page 26: ...ays determine location of utilities before trenching WARNING Fiber optic cables convey laser light that can injure your eyesight To locate utilities before trenching call 811 or 1 888 258 0808 US or C...

Page 27: ...any existing trenches or holes and toxic ground conditions Only operate trencher outdoors and do not breathe engine exhaust and fumes WARNING Engine exhaust contains carbon monoxide gas that is toxic...

Page 28: ...uld be gas oil petroleum water or sewer In any case stop digging shut off the engine and evacuate the area immediately Call 911 for help Electrical wires or cables If you think that you may have sever...

Reviews: