
56-101-01501_01502 Revision D
Page | 29
CHAPTER 5: RECEIVING, SHIPPING, AND STORAGE
1. RECEIVING
No special unpacking procedures are necessary. It is recommended that the factory-
shipping container and packing materials be retained should it become necessary, for any
reason, to re-ship the Test Set, such as for the
O.E.M.
recertification.
It is also recommended that upon receipt the test set should be carefully inspected for damage.
If the test set is damaged immediately, notify the carrier and the manufacturer.
2. SHIPPING
A. It is recommended that the factory-shipping container and packing materials be retained
should it become necessary, for any reason, to re-ship the Test Set, such as for the O.E.M.
recertification.
B. Ensure unit is powered OFF.
C. Disconnect the Leads from the Test Set receptacles.
D. Store the Leads in the pouch.
E. Use standard delicate electronic equipment packaging procedures when packing the Test
Set for reshipment.
3. STORAGE
A. Place a four-ounce bag of desiccant inside the case.
B. Close and latch the cover.
C. Store in a cool dry place.
Note
: Should the test set become exposed to moisture or very high humidity, dry it as
soon as possible and temporarily store it in a dehumidified area.