1
Safety,Warning and Mandatory Signs
EN-IST-BBZS5-0420
1 Safety,Warning and Mandatory Signs
WARNING SIGNS
Pictogram
Description
Notes
WARNING
General
This tells the person in question that the operation
described involves (when not performed in accordance
with the relative safety regulations) the risk of personal
injury.
WARNING
Hand crushing
Exercise caution in executing the procedure
Hand crushing hazard
WARNING
Heavy loads
Exercise caution in executing the procedure
Heavy suspended loads.
WARNING
Severe burns
Heat emission hazard Very hot surface, risk of severe
burns
WARNING
Risk of explosions
Take Care, risk of explosions
MANDATORY SIGNS (FOR THE OPERATOR IN CHARGE OF ASSEMBLY/DISASSEMBLY)
Pictogram
Description
Notes
OBLIGATION
General
Special instructions must be followed to avoid injury to
persons.
PROTECTIVE GLOVES
Safety gloves must be available for handling objects
which could cause hand injuries.
HARD HAT
A hard hat must be worn during machine lifting
operations to protect against hazards generated by
suspended loads.
FOOTWEAR
Use safety footwear to protect against the risks of
falling objects during operations to transport the
machine.
SUITABLE CLOTHING
Suitable clothing such as overalls. It is strictly
prohibited to wear clothes with large flapping sleeves
and/or other loose items which could easily get caught
up in machine parts.
5
Summary of Contents for BBZS5
Page 2: ...EN IST BBZS5 0420 MANUAL REVISION DATE 2...
Page 24: ...13 DisassemblyoftheBBZS5 BBYS5 BBWS51 EN IST BBZS5 0420 24 2 50 BBYS5 50 2 2 2 b...
Page 25: ...13 DisassemblyoftheBBZS5 BBYS5 BBWS51 EN IST BBZS5 0420 25 14 28 P T F E 2 14 2 3 3 c 4 c 4...
Page 27: ...13 DisassemblyoftheBBZS5 BBYS5 BBWS51 EN IST BBZS5 0420 27 35 34 11 274 275 10 12...
Page 29: ...13 DisassemblyoftheBBZS5 BBYS5 BBWS51 EN IST BBZS5 0420 29 3 4 23 238 128 2 2 2 14 5...
Page 30: ...13 DisassemblyoftheBBZS5 BBYS5 BBWS51 EN IST BBZS5 0420 30 6 7 9 8 286 120 50 35 34 274 275 10...
Page 32: ...13 DisassemblyoftheBBZS5 BBYS5 BBWS51 EN IST BBZS5 0420 32 19 31 256 20 21 22 209 13 12 4 11...
Page 35: ...14 Assembly of the BBZS5 BBYS5 BBWS51 EN IST BBZS5 0420 35 10 11 9 18 67 18 16 77 207...
Page 36: ...14 AssemblyoftheBBZS5 BBYS5 BBWS51 EN IST BBZS5 0420 36 274 275 10 12 13 14 35 34...
Page 37: ...14 Assembly of the BBZS5 BBYS5 BBWS51 EN IST BBZS5 0420 37 B A 38 BBZS5 44 BBWS51...
Page 40: ...14 AssemblyoftheBBZS5 BBYS5 BBWS51 EN IST BBZS5 0420 40 14 28 P T F E 2 14 2 23 23 c 24 c...
Page 41: ...14 Assembly of the BBZS5 BBYS5 BBWS51 EN IST BBZS5 0420 41 2 50 BBYS5 50 2 25 25 b...
Page 42: ...14 AssemblyoftheBBZS5 BBYS5 BBWS51 EN IST BBZS5 0420 42 26 1...
Page 43: ...14 Assembly of the BBZS5 BBYS5 BBWS51 EN IST BBZS5 0420 43 33 2 27...
Page 45: ...14 Assembly of the BBZS5 BBYS5 BBWS51 EN IST BBZS5 0420 45 4 5 2 286 6...
Page 46: ...14 AssemblyoftheBBZS5 BBYS5 BBWS51 EN IST BBZS5 0420 46 7 33 2...
Page 48: ...16 2D diagram BBZS5 EN IST BBZS5 0420 162D diagram BBZS5 PTFE Execution 48 33...
Page 49: ...17 2D diagram BBYS5 EN IST BBZS5 0420 172D diagram BBYS5 PTFE Execution 49 33...
Page 50: ...18 2D diagram BBWS51 EN IST BBZS5 0420 182D diagram BBWS51 50 43...
Page 53: ...20 Recommendations EN IST BBZS5 0420 NOTES 53...